Topic | Recent |
---|---|
Withdrawal of Appeal?LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by shashank gangil on Oct 20, 2019, 11:14 pm
Hi I need this information urgently. We recently got 83 points for a project after final construction review and 1 point was pending. This pending point is actually Regional priority point... Last reply: Tiffany Beffel, Oct 27, 2019, 7:11 pm |
|
Public Storm Sewer SystemEBOM-v4 SSc2: Rainwater managementposted by Simon Sue on Jun 27, 2019, 5:50 am
Hi, Our project in Shanghai City, China is studying whether it is possible to achieve SSc2. According to the local law, existing rainwater trenches were designed to transport rainwater... Last reply: Simon Sue, Jun 27, 2019, 9:57 pm |
|
Proof on Exceptional Calculations of Energy ModellingCS-2009 EAp2: Minimum Energy Performanceposted by Kathy Wong on Jan 7, 2019, 2:13 am
Our LEED project has adopted lighting control as energy-saving strategy for parking garage and documented as exceptional calculation in EAp2 and EAc1. Soon we received USGBC's comment asking for... Last reply: Kathy Wong, Jan 8, 2019, 4:48 am |
|
Project in 2 separate floor of a same building, can they go for one certification?CI-v4 MPR2: Must use reasonable LEED boundariesposted by shashank gangil on Aug 14, 2018, 10:24 pm
We are new to LEED Certification. We are currently bidding for a new LEED v4 ID+C: Commercial Interior Project. The project is currently operating in two floor (26th and 30th), both are separated... Last reply: shashank gangil, Jan 5, 2019, 4:32 am |
|
To use all FSC Mixed Sources label Paper, how many percentage we need fill into the Purchasing calculator field?EBOM-v4 MRc1: Purchasing - ongoingposted by Ray Hsing Chen on Oct 2, 2018, 10:49 pm
Regarding LEED v4 EBOM... Last reply: Ray Hsing Chen, Dec 18, 2018, 10:23 pm |
|
rainwater recovery at inside boundary, store at outside boundary, Can it be used as a calculation of potable water reduction?NC-v4 WEp1: Outdoor water use reductionposted by Ray Hsing Chen on Oct 1, 2018, 3:37 amPaula Melton Editorial Director BuildingGreen, Inc. LEEDuser Expert 183 thumbs up December 18, 2018- 11:29 am Hi, Ray! In this prerequisite, the use of rainwater does not come into play. Can you please re-post your question in this forum about the credit? Then I will see if the credit expert can answer this tricky question. Log in or register to post comments ... Last reply: Paula Melton, Dec 18, 2018, 11:29 am |
|
Kitchen faucet nominal flow rate vs maximum flow rateCI-v4 WEp1: Indoor water use reductionposted by shashank gangil on Oct 11, 2018, 9:52 pm
We are doing a CI project in Hong Kong and going to select a kitchen faucet for installation in the pantry. The Manufacturer data mentions 3.4 lpm as"nominal" flow rate of the fixture, which is ... Last reply: shashank gangil, Oct 12, 2018, 8:04 pm |
|
USGBC rainfall events calculatorNC-v4 SSc4: Rainwater managementposted by Leanne Niu on Nov 29, 2017, 11:01 pm
We could not get the 10 years of the historic daily rainfall data, if we could leave the sheet of historical data blank? and how we calculate the total runoff we need to control on site? Last reply: Olga Yuil, Sep 17, 2018, 1:59 pm |
|
Paints for ArtworkCI-v4 EQc2: Low-emitting materialsposted by Felicity Lee on Jul 26, 2018, 3:49 am
Hi All, I have a small office project where we are going to do wall artwork and to be painted by artists on-site. It is highly uncommon to have artists' paints tested for... |
|
Use of Pavegen as permanent entryway systemCS-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Kollsman Chan on May 20, 2018, 11:04 pm
Hi LEED experts, I am currently designing a project in Hong Kong that tries to use pavegen with carpet coating at the entrance. I'm wondering if the slots of pavegen can fulfill the IEQ5... Last reply: Emily Purcell, May 21, 2018, 10:24 am |