Topic | Recent |
---|---|
Baseline Projects with Several Physically Distinct StructuresHospitality-NC-v4 EAp2: Minimum Energy Performanceposted by MICHAIL MENTZOS on Sep 18, 2023, 3:37 am
We are currently working on a project which has a total area of about 4,000m2. The project consist of several buildings, each of them is no more than... Last reply: Marcus Sheffer, Sep 22, 2023, 11:29 am |
|
Baseline for Projects with Several Physically Distinct StructuresNC-v4 MPR3: Must comply with project size requirementsposted by Mike Mentzos on Sep 15, 2023, 6:57 am
All, We are currently working on a hotel project, which consists from several buildings the sum of them is about 4,000 square meters. Each individual bulding is not greater than 2,300... |
|
Rainwater ManagementNC-v4 SSc4: Rainwater managementposted by Ribert Senzoga on Sep 5, 2023, 12:52 pm
I am evaluating the Rainwater Management of a warehouse project where the water table is very high and we don't have enough depth to make a water basin. Does LEED have any suggestion to deal with... |
|
locker romsPilot-Credits WEpc147: All-Gender Restroomsposted by Belén Palao on Apr 27, 2022, 12:45 pmPaula Melton Editorial Director BuildingGreen, Inc. LEEDuser Expert 183 thumbs up April 28, 2022- 11:21 am Hi, Miguel! I'm hoping someone on here might have an answer for you. However, just keep in mind that posting to LEEDuser is not the same as writing to LEED Coach. This is an independent grassroots forum. The email for LEED Coach is leedcoach@usgbc.org. Log in or register to post comments Zeynep Cakir LEED AP BD+C, WELL AP, Sustainable Building Consultant ECOBUILD LEEDuser Basic Member 14 thumbs up March 13, 2023- 9:12 am Dear Miguel, Have you received any feedback from the LEED... Last reply: Vanessa Hostick, Aug 14, 2023, 12:05 pm |
|
All campus occupants will use showerheads inside our buildingNC-v4 WEp2: Indoor water use reductionposted by Paola Moschini on Aug 7, 2023, 8:30 am
Our building is on a campus (industrial facility where all workers need to make a shower at the end of the worktime) and our building provides restroom facilities with showerheads for all other... Last reply: Emily Purcell, Aug 7, 2023, 12:14 pm |
|
Ventilation WarehousesNC-v4 EQp1: Minimum indoor air quality performanceposted by Helena Garcia on Jun 20, 2016, 4:12 am
We are certifing a project with two buildings, the first is an offices, the second is a warehouses to rent in Spain. Last reply: Emma Loris, Jul 26, 2023, 12:28 am |
|
Ventilation in corridorsNC-v4 EQp1: Minimum indoor air quality performanceposted by Luana Jerez on Jul 18, 2023, 9:30 am
We are working on an office building 17 meters wide, on one floor, the layout is a 3.5-meter distribution corridor, serving as a division between two rows of offices. These offices are equipped... |
|
Regional ACP for LEM VOC Emissions Evaluation- Manufacturer statementNC-v4.1 EQc2: Low-emitting materialsposted by Muhammad Mahasneh on May 10, 2023, 3:54 am
Greetings, i would like to ask about the April 2023 Update to the Regional ACP ID# 100002473 regarding Low Emitting materials: "Laboratories that conduct the tests must be... Last reply: Paula Melton, Jul 6, 2023, 9:14 am |
|
Ratio Windows/Wall in baseline model Table G1.1.1-1NC-v4.1 EAp2: Minimum Energy Performanceposted by Marc Maso on Jun 23, 2021, 12:10 pm
Dear Srs, I hace a question about the ratio windows/walls in leed v4.1. Is for a building with two differents uses: 3.117 m2 of office and 13.472m2 of warehouse. When we had modeled the... Last reply: Mark Terpstra, May 31, 2023, 4:40 pm |
|
5.4.3.2 Air Leakage application in no heated or cooled spacesWarehouses-NC-v4 EAp2: Minimum Energy Performanceposted by Paola Moschini on May 30, 2023, 5:20 am
About Mandatory Provision ASHRAE 90.1-2010 point 5.4.3.2 Air Leakage. Must this prescription be applied also to fenestration and doors of a warehouse not heated or cooled? We are in Climate zone... Last reply: Marcus Sheffer, May 30, 2023, 10:43 am |