Minimum Energy Performance CalculatorCS-v4 EAp2: Minimum Energy Performanceposted by Lucy Townsend on Sep 27, 2022, 4:02 am
Hi, Has anyone had any issues filling out the minimum energy performance calculator? We have followed ASHRAE guidance for modelling but some of the inputs don't align with what is in the... |
|
environmental attributes (e.g. REC’s) retainedNC-v4.1 EAc2: Optimize Energy Performanceposted by Martin Maribo on Sep 8, 2022, 9:53 am
Can the purchase of environmental attributes be used to improve the Cost PCI points? Last reply: Jamy Bacchus, Sep 12, 2022, 10:57 pm |
|
Total Site Paving AreaNC-v4 SSc5: Heat Island Reductionposted by Maria Perzon on Mar 7, 2018, 5:13 am
I am not sure about the definition of "Total Site Paving Area". I have a already developed site with a building that is to be majorly rebuilt. Could I use the old site paving area as my reference... Last reply: Irene Chung, Jun 29, 2022, 10:46 am |
|
Open fireplacesNC-v4 EQp1: Minimum indoor air quality performanceposted by Cristina Florit on Jan 24, 2020, 8:43 am
I am working in a hotel project where open fireplaces are being considered. As all fireplaces in residential projects must have solid glass enclosures, I am wondering if this requirement... Last reply: Panagiotis Paliouras, May 26, 2022, 10:42 am |
|
Remediation Requirement by the Local AuthorityCS-v4 LTc3: High priority siteposted by on May 17, 2022, 8:28 am
Hi, We have a C&S Office Building project in Ireland. The project site is contaminated which is defined by Environmental Site Assessment Phase II including soil test results. The site... Last reply: Emily Purcell, May 19, 2022, 12:28 pm |
|
Experience with the CreditPilot-Credits EQpc116: Daylight in nonregularly occupied spacesposted by Sara Galar on May 17, 2022, 8:39 am
Thanks to the shape of the building, dimensions and quality of the facade, we were able to pursued this Pilot credit. By a group discussion, taking into consideration good design decisions... |
|
GREEN POWER AND CARBON OFFSETS- 5 years contractCI-v4 EAc6: Green power and carbon offsetsposted by Russell Fatkoulin on Feb 21, 2022, 8:23 am
Hi, The property owner has had a green electricity agreement with the electricity supplier for many years. However, here in Sweden, people do not usually sign binding contracts and have... Last reply: Aparna Pradeep Kumar, Apr 6, 2022, 10:01 am |
|
"..surface reflection and visibility of any surface 3 frit patterns.."Pilot-Credits SSpc55: Bird collision deterrenceposted by Maciej Starewicz on Aug 10, 2018, 6:51 am
In General Pilot Documentation Requirements we can find the following position:
Last reply: Stefan Knust, Mar 16, 2022, 11:58 am |
|
Access to Quality Transit: Functional entry of the project in a MallRetail-CI-v4 LTc3: Access to quality transitposted by herminia gammarano on Mar 7, 2022, 5:02 am
Hello LEED community, My question is regarding to the requirement of the credit Access to Quality transit, It said to locate any fuctional entry of the project within 1/4... |
|
Reused element in either structure or enclosureNC-v4.1 MRc1: Building life-cycle impact reductionposted by Maria Porter on Feb 22, 2021, 3:45 am
Option 2, path 4 – LCA. “….and incorporate... Last reply: Maria Porter, Mar 7, 2022, 3:45 am |