Log in
Forum » Europe – Western
Topic

how is considered Paris’ tramway?

CS-v4 LTc5: Access to quality transit
posted by Marion THIBAULT on Jun 23, 2020, 11:47 am

Hi everyone,

I have some trouble to determine if the Paris’ tramway corresponds to a...

Last reply: Tony Grace, Aug 26, 2020, 9:45 am

Ventilation of parking garages

CS-v4 EAp2: Minimum Energy Performance
posted by Sarah Leenknegt on Mar 11, 2019, 7:51 am

Hi

We are modelling an office building in Switzerland with LEED v4 Core and Shell and have a question regarding the required ventilation rate for parking garages. According to ASHRAE 62.1...

Last reply: Tyler Thumma, Aug 21, 2020, 11:38 am

ACP- No Cooling Tower (Core & Shell v4)

CS-v4 WEc3: Cooling tower water use
posted by Anke Koch on Dec 12, 2017, 3:38 am

(https://leeduser.buildinggreen.com/forum/acp-no-cooling-tower-core-shell-v4) also confirms my understanding of the interpretation. Log in or register to post comments ...

Last reply: Erkki Seinre, Aug 6, 2020, 9:13 am

LEED online Substitution v4.1 for v4 MRC1: Submit 4 Points for Option 4 Path 4?

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by J Schütz on Mar 20, 2020, 9:02 am

Dear all,

as our project meets the requirements of Path 4, we like to submit 4 Points in LEED online. For Option 4 under LEED v4 only 3 Points are available at the thresholds. Is it...

Last reply: J Schütz, Aug 5, 2020, 1:49 am

Has anybody used microlouvers already?

NC-v4 EQc6: Interior lighting
posted by Pierre-Antoine Legrand on Jul 30, 2020, 5:12 am

I am trying to figure out how to integrate microlouvers in a double-skin façade.

The architect has decided that only 50% of the louvers would be operated by the user...

Does...

Tolerance within the achievement of criterias due to different affectations

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Audrey LEDESERT on Jun 18, 2020, 4:37 am

Tristan Roberts Storyteller Quill Nook Farm LEEDuser Expert 11462 thumbs up July 21, 2020- 9:14 pm Audrey, this will be determined for each individual credit. I would suggest reviewing the credit language for the specific questions you have, and posting your questions to the specific LEEDuser forum for that credit. Log in or register to post comments ...

Last reply: Tristan Roberts, Jul 21, 2020, 9:14 pm

Indoor Air Measurements: required measurement duration

EBOM-v4.1 EQp4: Indoor Environmental Quality Performance
posted by Roland Braun on Jun 26, 2020, 5:33 am

Hi to all:
We carry out indoor air measurements throughout Germany, including also for Leed certifications (so far Leed v3). Now I have a request for measurements according to Leed v4.1. A...

Last reply: Roland Braun, Jun 30, 2020, 2:19 pm

CxA: independance of the design team

NC-v4 EAc1: Enhanced Commissioning
posted by Audrey LEDESERT on Jun 25, 2020, 5:08 am

In our office, we have 2 separate departments : one that works in building technicals (HVAC/San) and the 2nd that make consulting.

The consulting department is in charge of LEED...

Last reply: Marcus Sheffer, Jun 25, 2020, 9:06 am

Baseline parking for a DATACENTER

CS-v4 LTc7: Reduced parking footprint
posted by Marion THIBAULT on Jun 23, 2020, 12:11 pm

Hi everyone,

I'm working on a DATACENTER project, and I can't find the baseline parking capacity for this type of building. It is not included in the "TABLE 1 - Base Ratios for parking...

Baseline parking for a DATACENTER

NC-v4 LTc7: Reduced parking footprint
posted by Marion THIBAULT on Jun 23, 2020, 12:10 pm

Hi everyone,

I'm working on a DATACENTER project, and I can't find the baseline parking capacity for this type of building. It is not included in the "TABLE 1 - Base Ratios for parking...