Dist. Center- Light polutionWarehouses-NC-v4 SSc6: Light Pollution Reductionposted by Antonio Macedo Filho on May 23, 2017, 11:26 am
If the design of a distribution center worked 24 hours in 3 shifts, even at night, could we not get that credit? If we use external lighting with zone presence sensors would not it be possible?... Last reply: Bill Swanson, Aug 28, 2017, 11:55 am |
|
Window-sillNC-v4 EQc8: Quality Viewsposted by Antonio Macedo Filho on Aug 16, 2017, 4:19 pm
I would like to know if there is a maximum obstruction height of views for option 1. In the case in my project, if it is an office building, with a central atrium and in that atrium, we would... Last reply: TODD REED, Aug 28, 2017, 7:30 am |
|
IEQ c4.2 Paints- Laboratory tests according to SCAQMD Rule#1113Schools-2009 IEQc4.2: Low-Emitting Materials—Paints and Coatingsposted by Andrea Tayah Esperão Malta de Campos on Aug 10, 2017, 5:16 pm
In a LEED 2009 CS project in Brazil and a Epoxi Paint was used in a parking garage. The lab test indicates the brazillian standard ABNT NBR 16388 – (Determinação do teor de compostos orgânicos... Last reply: Tristan Roberts, Aug 26, 2017, 8:07 pm |
|
2012 EPA CGP comply with this prerequisite?CS-2009 SSp1: Construction Activity Pollution Preventionposted by Pamela Svetllana Santos Souza on Jul 14, 2017, 7:13 am
I'm modelling for LEED C&S 2009 and the project has 26 floor type of mixed-use offices. Does the 2012 EPA... Last reply: Tristan Roberts, Aug 26, 2017, 6:10 pm |
|
Core & Shell RetrofitCS-v4 SSc1: Site assessmentposted by Juliana Malho on Jun 9, 2017, 9:07 am
I'm wondering if the credit is achievable by retrofit projects. In my case the site is previous developd and 100% imperviousness by the existing construction including parking lots and the... Last reply: Tristan Roberts, Aug 26, 2017, 12:38 pm |
|
Shades and blindsNC-v4 EQc7: Daylightposted by Antonio Macedo Filho on Aug 16, 2017, 1:07 pm
I'm working on an office project, and there's an atrium. We want to use a translucent and permeable tensioning fabric on the roof of this atrium. Could this... Last reply: TODD REED, Aug 17, 2017, 10:41 am |
|
ViewsNC-2009 IEQc8.2: Daylight and views - viewsposted by Antonio Macedo Filho on Aug 16, 2017, 4:31 pm
I would like to know if there is a maximum obstruction height of views for option 1. In the case in my project, if it is an office building, with a central atrium and in that atrium, we would... Last reply: TODD REED, Aug 17, 2017, 9:29 am |
|
BrownfieldCS-v4 LTc3: High priority siteposted by Antonio Macedo Filho on Jun 23, 2017, 12:32 pm
Hi Tristan, I have a project in a... Last reply: Tristan Roberts, Jul 7, 2017, 4:37 pm |
|
Brazilian Equivalent StandardCS-2009 EAp2: Minimum Energy Performanceposted by Pamela Svetllana Santos Souza on Jun 14, 2017, 11:50 am
Hello, I'm modelling for LEED C&S 2009. The project has 26 floor type of mixed-use offices. My question is about the Minimum Energy Perfomance credit (EAp2) and equivalent standards... |
|
Anti Smoking SignNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Marcelo Maciel de Santa Helena on Dec 18, 2015, 12:13 pm
We have a question about the location of the anti smoking signs. Last reply: James Bell, Apr 21, 2017, 2:05 pm |