Rainfall Events calculatorCS-v4 SSc4: Rainwater managementposted by Simona Kabadova on Oct 20, 2021, 5:11 am
The project is situated in Sofia, Bulgaria. From the our National Institute of Meteorology and Hydrology we have historical data for daily precipitation only for two years - 2020 and 2021. As I... |
|
Process water use- total building regulated water use definitionNC-v4.1 WEc3: Optimize Process Water Useposted by Zsuzsanna Gidro on Sep 28, 2021, 10:01 am
Hi! It is unclear to me what does the total building regulated water use means in this case. Is this equal to the indoor water use (plumbing fixtures use) calculated in the prerequisite?... |
|
LEED V3 EAp2 Minimum Energy Performance: Exterior Lighting power prerequisiteNC-2009 EAp2: Minimum Energy Performanceposted by Tomasz Kolsicki on Jul 23, 2021, 5:41 am
Hello, I am currently answering review comments from certification unit for C&S office buiilding. We are struggling with exterior lighting issue, because proposed external lighting... Last reply: Marcus Sheffer, Aug 3, 2021, 9:50 am |
|
Studio apartment classificationNC-v4 EQc6: Interior lightingposted by Ekaterina Roslavker on Apr 30, 2021, 7:32 am
Hi all, can anyone tell me whether a mezzanine studio apartment should be classified as an individual space as a whole, or it has both individual and multi-occupant spaces (bedroom on the... Last reply: Allen Cornett, Jun 30, 2021, 11:57 am |
|
LEED Online is not displaying Reginal Priority credit categoryNC-v4 RPc1: Regional Priorityposted by Norbert Harmathy on Jun 8, 2021, 8:55 am
Hello, We registered a new project under LEED v4 NC. In ALL Credit categories listed, there is NO Regional Priority credit category. How should we upload the documentation for the... Last reply: Simon Joubert, Jun 23, 2021, 2:24 am |
|
Requirement for dishwasherNC-v4 WEp2: Indoor water use reductionposted by Vassily Lesnykh on May 14, 2021, 5:21 am
Hello. In the WEp2 we have got a requirement that dishwasher's water consumption must be less or equal 6 liters/rack. What does it mean - rack? Does it mean loading or watter waste for one row of... Last reply: emily reese moody, May 21, 2021, 12:51 am |
|
Airflow rates for pressure drop in LEED v4CS-v4 EAp2: Minimum Energy Performanceposted by Przemysław Rejczak on Mar 19, 2019, 7:07 am
Dear everyone, For one of our project we received the Review Comment regarding to... Last reply: Tyler Thumma, Apr 21, 2021, 11:31 am |
|
Hot-water design supply and return temperature differenceCS-v4 EAp2: Minimum Energy Performanceposted by Przemysław Rejczak on Feb 22, 2021, 10:11 am
Dear Everyone, I got a comment for one of our project which in my opinion is not ccompatibe with ASHRAE. We do not have much time for the response, so I decided to ask about it here. ...Last reply: Tyler Thumma, Mar 4, 2021, 3:34 pm |
|
Residential or New Construction rating system?LEED Rating System Selectionposted by Barbora Cicvárková on Feb 22, 2021, 8:37 am
Hi, please, could someone explain the difference between the "Residential: Multifamily" rating system and the "BD+C New Construction" rating system? Why should somebody choose one or the... |
|
Office and residential buildings on a campus site- campus creditsLEED Rating System Selectionposted by Barbora Cicvárková on Feb 22, 2021, 4:51 am
Hi, we have building that is connected with underground parkning and has 5 single sections above ground (section A - E). Three of them are offices and two of them are residential. The... |