Log in
Forum » U.S. and Canada
Topic

State DEQ-Listed Brownfield Site- credit denied

NC-2009 SSc3: Brownfield Redevelopment
posted by Michele Otazua on Jan 21, 2015, 5:19 pm

In our first review, our credit was denied. We are on a zero lot line property with the building occupying the entire site, but the site is listed on the state DEQ register of brownfield sites...

Last reply: Michele Otazua, Jan 26, 2015, 4:00 pm

Is there a occupancy % under 100% that is still considered 100%?

EBOM-2009 PIf3: Occupant and Usage Data
posted by Vanessa Seibert on Oct 23, 2014, 7:36 pm

In our attempt to fill out PI form 3 we are recognizing that completing the form to note every time within 5 years that the 800,000 s.f. building was not 100% occupied (and the start and stop...

Last reply: Trista Brown, Jan 26, 2015, 3:36 pm

Can we write up this plan and use it as the basis for our EBOM?

Pilot-Credits SSpc64: Site improvement plan
posted by Katherine Carlin on Jan 16, 2015, 1:56 pm

Hi there, We are wondering if we can get a pilot credit for creating this plan by identifying everything that we are doing this year for our...

Last reply: Trista Brown, Jan 25, 2015, 7:43 pm

BDC Material & Resource Calculator- Percentage Regional

CS-2009 MRc5: Regional Materials
posted by Suha Hyderabad on Dec 5, 2014, 3:11 pm

I have a question regarding the BDC Material Tracker, % Regional. The cold formed metal framing Sub says that the steel was manufactured within 28 miles and has been extracted within 74 miles...

Last reply: Jon Clifford, Jan 25, 2015, 3:07 pm

PC 29 Index

Pilot-Credits PC29: Housing and Jobs Proximity
posted by Gary Hansen on Jan 23, 2015, 5:41 pm

We registered for this credit back in 2011 and we are finally completing the project. I think I just need to participate here and complete the online survey.

What does LEED consider as Sitework?

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Erika Duran on Jan 20, 2015, 5:08 pm

Project sitework and stabalization techniques were implemented during the beginning stages of the project and followed our...

Last reply: Michael DeVuono, Jan 23, 2015, 8:07 am

Energy Modeling Requirements

Retail-CI-v4 EAp2: Minimum Energy Performance
posted by Jeff Halliwell on Jan 22, 2015, 11:54 am

On LEED V4, ID+C Commercial Interiors:Retail, is there an option to use the California Title 24 as the calculation method or do you have to use ASHRAE 2010? I believe on LEED 2009 we had this...

Plastic Cement Welding & PVC Welding

CS-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Lilian Seow on Jan 20, 2015, 3:19 pm

Page 509-LEED Reference Guide 2009-...

Last reply: Jon Clifford, Jan 21, 2015, 7:14 pm

PLF4 was not approved because..& recommendation for final submi

NC-2009 PIf4: Schedule and Overview Documents
posted by Matt Dem on Jan 21, 2015, 2:28 pm

Plf4 was not approved because...

Last reply: William Weaver, Jan 21, 2015, 2:34 pm

Two new buildings joined by unconditioned walkway

NC-2009 MPR2: Must be a complete, permanent building or space
posted by P Fanfulik on Jan 21, 2015, 9:08 am

I have a new bus garage (maintenance and admin offices) connected to the fuel/wash building by an open air bridge (unconditioned space). The designer intends to use the bush wash reclaim system...

Last reply: P Fanfulik, Jan 21, 2015, 12:30 pm