Log in
Forum » U.S. and Canada
Topic

Reviewr's Comment is requesting labor and delivery

CI-2009 MRc4: Recycled Content
posted by Sarah Thompson on Mar 6, 2015, 4:34 pm

In all my 40 LEED projects I have never included labor and delivery to a material's cost total. I received the following comments and am at a loss as to how to respond:

Let me also be...

Last reply: RETIRED, Mar 9, 2015, 10:57 am

Fraction use of FSC materials

NC-2009 MRc7: Certified Wood
posted by Lilian Seow on Mar 5, 2015, 1:54 pm

This question and answer come from above and Missing Manual:
A product has...

Plant Design for Proposed bldg

NC-2009 EAp2: Minimum Energy Performance
posted by Julian Park on Mar 3, 2015, 8:48 am

If a new building will be served by an existing chiller plant that already serves an existing building, does the Plant design for the Proposed Alternative need to model the full chiller size,...

Last reply: Marcus Sheffer, Mar 5, 2015, 12:35 pm

ammonia-based fertilizers

Schools-EBOM-v4 SSc5: Site management
posted by R. Ted Krasnesky on Mar 5, 2015, 10:41 am

Can fertilizers contain a small percentage of Ammoniacal Nitrogen and still be considered non-ammonia based? We are considering a fertilizer with 18% Nitrogen or which 2.04% in Ammoniacal...

Duct Sealant

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Yaneth Galindo on Mar 4, 2015, 10:04 am

I used a duct sealant with...

Last reply: Jon Clifford, Mar 4, 2015, 8:45 pm

Warehouse with office space

EBOM-2009 PIf3: Occupant and Usage Data
posted by Saul Pichardo, AIA on Mar 4, 2015, 8:35 pm

I am working on a warehouse/distribution project that has approx. 200,000 sf warehouse/ distribution space with a 6,444 sf office that supports the warehouse operations. There are 14 full time...

Packaging?

NC-2009 MRc4: Recycled Content
posted by Caroline O'Leary on Mar 4, 2015, 10:10 am

Here's one I haven't seen and would love for people to weigh in on. A manufacturer of, let's say paint, has provided...

Last reply: Jon Clifford, Mar 4, 2015, 7:39 pm

Warehouse Office

EBOM-2009 IEQc3.5: Green cleaning - indoor chemical and pollutant source control
posted by Saul Pichardo, AIA on Dec 3, 2014, 1:55 pm

My project has a 6,500sf office space serving a 207,000sf warehouse/distribution center (213,500sf total area). The office has three doors that lead to the warehouse.

The warehouse...

Last reply: Saul Pichardo, AIA, Mar 4, 2015, 7:05 pm

Laboratory 90.1 Modeling

NC-2009 EAc1: Optimize Energy Performance
posted by Victoria Watson on Dec 4, 2014, 11:23 am

Hi,
I am modeling a laboratory which has a small area of office space for LEED and wanted to check a couple of approaches:
1) The engineers have informed me that the lab has to be a...

Last reply: Marcus Sheffer, Mar 4, 2015, 2:52 pm

High-Volume vs. Convenience Copier 5,000 pages- CIR 872 Canada

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Lindsey Kindrat on Mar 2, 2015, 12:46 pm

Heads up for those working on LEED Canada NC 2009 projects,...