Topic | Recent |
---|---|
Option 1 and Option 2?NC-v4 SSc5: Heat Island Reductionposted by Jonathan Weiss on Jan 8, 2015, 10:50 am
For a project where we're pushing for parking garages for the cars, but have asphalt driveways, can we consider the footprint of the garage as hardscape that meets the requirement? Otherwise we... Last reply: Karin Miller, Apr 16, 2015, 5:47 pm |
|
Mechanic Area WashfountatinNC-2009 WEp1: Water Use Reductionposted by Robin Dukelow on Mar 31, 2015, 2:40 pm
We have a NC-2009 project were there is an automotive service area that has a washfountain for use by the mechanics only. They also have a locker room area with toilets, urinals, lav's, and... Last reply: Susan Walter, Apr 16, 2015, 4:41 pm |
|
Open Floor Plan with different Tvis ValuesNC-2009 IEQc8.1: Daylight and views - daylightposted by Marisa Britton on Apr 16, 2015, 1:31 pm
Can I do prescriptive method of calculation for an open floor plan if the N+W glazing walls of the building have a... Last reply: Marisa Britton, Apr 16, 2015, 2:24 pm |
|
Future ExpansionNC-2009 SSc5.2: Site development - maximize open spaceposted by Karl Heitman on Mar 31, 2015, 10:44 am
Our project, an industrial manufacturing facility, is expecting future expansion, and it has been noted on our permit/construction drawings. What's the best way to handle to this when it comes... Last reply: Ellen Mitchell, Apr 16, 2015, 12:45 pm |
|
Does CI fit into BD+C?LEED Rating System Selectionposted by Sara Greenwood on Apr 14, 2015, 12:43 pm
Hello, I am developing TI Guidelines for unfinished retail space in a building pursuing BD+Cv2009. Can the future tenant pursue CI? Last reply: Michelle Rosenberger, Apr 15, 2015, 6:53 pm |
|
Can We Use Both Facility and Site Rates?NC-2009 MRc2: Construction Waste Managementposted by Sara Zoumbaris on Apr 15, 2015, 10:08 am
Hi all, Last reply: RETIRED, Apr 15, 2015, 10:55 am |
|
aerosol line saver (also posted in IEQc4.1)NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Lyle Axelarris on Apr 14, 2015, 7:07 pm
I also posted this in IEQc4.1 since I do not know where, if anywhere, this product would go: Last reply: Jon Clifford, Apr 14, 2015, 11:44 pm |
|
aerosol line saverNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Lyle Axelarris on Apr 14, 2015, 7:06 pm
Has anyone considered reporting the use of aerosol "line saver"? This is the stuff sprayed over chalk lines during construction to preserve construction reference lines for layout. It's applied... Last reply: Jon Clifford, Apr 14, 2015, 11:40 pm |
|
Project on HoldGeneral forumsposted by Nereyda Rodriguez on Apr 8, 2015, 2:04 pm
Our project has been put on hold indefinitely by the Owner. There is a chance that it may come back in a year or two. The project is registered under NC v2009. We had not yet submitted the... Last reply: Tristan Roberts, Apr 14, 2015, 12:02 pm |
|
Transitional Entry Atrium Lobby belong in Energy Model?NC-2009 EAp2: Minimum Energy Performanceposted by Joyce Kelly on Apr 13, 2015, 2:53 pm
A five story Atrium is being constructed in a science building. It is also the main entry into the building and furnished with benches for transient use. There are no desks or offices located in... Last reply: Jean Marais, Apr 14, 2015, 12:55 am |