Cold C&S- No HVACCS-2009 EAc1: Optimize Energy Performanceposted by Scott Johnson on Jan 13, 2015, 3:22 pm
We have a project that consists of a cold core and shell that will have warm lobby. The remainder of the building will be unconditioned and the actual tenant or building use (lab, office, etc)... Last reply: Marcus Sheffer, Jan 17, 2015, 2:34 pm |
|
Ongoing Consumables in HC ClinicEBOM-v4 MRp1: Ongoing purchasing and waste policyposted by Michelle DiPenti on Oct 27, 2014, 4:28 pm
Is there a clear answer on which ongoing consumables to include in the policy? As I go down the list of our "most purchased product categories based on total annual purchases," I'm finding some... Last reply: Susan Walter, Jan 16, 2015, 3:58 pm |
|
Steel Extraction Location- Manufacturer ClaimNC-2009 MRc5: Regional Materialsposted by Sara Zoumbaris on Jan 16, 2015, 1:33 pm
Hi all, I am spinning my wheels second guessing what is now accepted. If a manufacturer provides a letter stating 100% of the steel used has been manufactured and extracted within 500 miles from... Last reply: Marcia Weekes, Jan 16, 2015, 1:55 pm |
|
Complex projects benefit from turn-key waste mgmt servicesPilot-Credits MRpc69: Construction and demolition waste managementposted by Joanna Switzer on Jan 15, 2015, 1:58 pm
The recently completed Dr. Phillips Center for the Performing Arts facility, located in the active downtown district of Orlando FL, achieved an over 75% diversion rate for demolition and... |
|
No longer required to complete Design prereqs before review?NC-2009 EAp2: Minimum Energy Performanceposted by Susan Di Giulio on Jan 14, 2015, 10:32 pm
From what I have read about the new website, it is no longer required to complete all design prerequisites before submitting for Design Review (split review assumed). We have been hung... Last reply: Marcus Sheffer, Jan 14, 2015, 10:44 pm |
|
LEED Boundary / Silt FencingNC-2009 SSp1: Construction Activity Pollution Preventionposted by Carrie Laurendine on Dec 30, 2014, 6:02 pm
Currently working on a project that is a large site with an existing building currently on the site. The new LEED building is away from this current building creating a smaller LEED Boundary than... Last reply: Carrie Laurendine, Jan 14, 2015, 1:04 pm |
|
EAp2 Domestic Hot Water Pump sizingNC-2009 EAp2: Minimum Energy Performanceposted by MKK LEED on Jan 12, 2015, 7:57 pm
Hello, Last reply: Marcus Sheffer, Jan 13, 2015, 10:24 am |
|
Indoor/Outdoor PoolNC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Tom Liebel on Jan 12, 2015, 2:36 pm
We're wrestling with the walkoff mat requirement for a recreation center where there is an indoor/outdoor pool - one end of the pool and the roof retract during clement weather to provide an... Last reply: Michelle Halle Stern, Jan 12, 2015, 4:15 pm |
|
NC V4: Advanced Energy Metering of Entire BuildingNC-v4 EAc3: Advanced Energy Meteringposted by Erik Gutierrez on Jan 9, 2015, 1:22 pm
Hello all, I'm looking at metering a new construction building with a single controller. The specific controller that I'm looking at has the capability to monitor each individual end use (... Last reply: Marcus Sheffer, Jan 12, 2015, 3:19 pm |
|
EAp1-1 Commissioning Report Upload Location MissingCI-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Sam Stoltze on Jan 9, 2015, 2:57 pm
The new LEED Online interface seems to be missing the ability to upload a... Last reply: Sam Stoltze, Jan 12, 2015, 11:18 am |