Cold C&S- No HVAC

CS-2009 EAc1: Optimize Energy Performance
posted by Scott Johnson on Jan 13, 2015, 3:22 pm

We have a project that consists of a cold core and shell that will have warm lobby. The remainder of the building will be unconditioned and the actual tenant or building use (lab, office, etc)...

Last reply: Marcus Sheffer, Jan 17, 2015, 2:34 pm

Ongoing Consumables in HC Clinic

EBOM-v4 MRp1: Ongoing purchasing and waste policy
posted by Michelle DiPenti on Oct 27, 2014, 4:28 pm

Is there a clear answer on which ongoing consumables to include in the policy? As I go down the list of our "most purchased product categories based on total annual purchases," I'm finding some...

Last reply: Susan Walter, Jan 16, 2015, 3:58 pm

Steel Extraction Location- Manufacturer Claim

NC-2009 MRc5: Regional Materials
posted by Sara Zoumbaris on Jan 16, 2015, 1:33 pm

Hi all, I am spinning my wheels second guessing what is now accepted. If a manufacturer provides a letter stating 100% of the steel used has been manufactured and extracted within 500 miles from...

Last reply: Marcia Weekes, Jan 16, 2015, 1:55 pm

Complex projects benefit from turn-key waste mgmt services

Pilot-Credits MRpc69: Construction and demolition waste management
posted by Joanna Switzer on Jan 15, 2015, 1:58 pm

The recently completed Dr. Phillips Center for the Performing Arts facility, located in the active downtown district of Orlando FL, achieved an over 75% diversion rate for demolition and...

No longer required to complete Design prereqs before review?

NC-2009 EAp2: Minimum Energy Performance
posted by Susan Di Giulio on Jan 14, 2015, 10:32 pm

From what I have read about the new website, it is no longer required to complete all design prerequisites before submitting for Design Review (split review assumed).

We have been hung...

Last reply: Marcus Sheffer, Jan 14, 2015, 10:44 pm

LEED Boundary / Silt Fencing

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Carrie Laurendine on Dec 30, 2014, 6:02 pm

Currently working on a project that is a large site with an existing building currently on the site. The new LEED building is away from this current building creating a smaller LEED Boundary than...

Last reply: Carrie Laurendine, Jan 14, 2015, 1:04 pm

EAp2 Domestic Hot Water Pump sizing

NC-2009 EAp2: Minimum Energy Performance
posted by MKK LEED on Jan 12, 2015, 7:57 pm

Hello,
Appendix G Table G.3.1 - Service Hot water systems states "The service hot-water system in the baseline building design shall use the same energy source as the corresponding...

Last reply: Marcus Sheffer, Jan 13, 2015, 10:24 am

Indoor/Outdoor Pool

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Tom Liebel on Jan 12, 2015, 2:36 pm

We're wrestling with the walkoff mat requirement for a recreation center where there is an indoor/outdoor pool - one end of the pool and the roof retract during clement weather to provide an...

Last reply: Michelle Halle Stern, Jan 12, 2015, 4:15 pm

NC V4: Advanced Energy Metering of Entire Building

NC-v4 EAc3: Advanced Energy Metering
posted by Erik Gutierrez on Jan 9, 2015, 1:22 pm

Hello all,

I'm looking at metering a new construction building with a single controller. The specific controller that I'm looking at has the capability to monitor each individual end use (...

Last reply: Marcus Sheffer, Jan 12, 2015, 3:19 pm

EAp1-1 Commissioning Report Upload Location Missing

CI-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Sam Stoltze on Jan 9, 2015, 2:57 pm

The new LEED Online interface seems to be missing the ability to upload a...

Last reply: Sam Stoltze, Jan 12, 2015, 11:18 am