Log in
Forum » U.S. and Canada
Topic

PIf2- Project Summary Details

NC-2009 PIf2: Project Summary Details
posted by Karly Michalowski on Mar 30, 2015, 11:41 am

What to do if project owner will not supply project budget?

Where are PIf3-1 forms now?

NC-2009 PIf3: Occupant and Usage Data
posted by Susan Di Giulio on Mar 4, 2015, 5:00 pm

Hi,
I feel dumb asking this but where are the LEED-NC v2009 PI3-1 forms for calculating occupancy located in the new interface?

Last reply: Deborah Lucking, Mar 27, 2015, 6:28 pm

C&S Individual Project within a Campus Registration

LEED Guidance for Campuses and Multiple Buildings
posted by Nate Steeber on Mar 27, 2015, 3:35 pm

This may be a very simple question, and perhaps our team is looking into this too deeply:

We have a campus which we intend to use a Master Site with individual registrations (i.e. not a...

Last reply: Deborah Lucking, Mar 27, 2015, 5:07 pm

Areas passing at one time but not another

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Lisa Fabula on Mar 26, 2015, 7:01 pm

If part of the building area passes at 9am but does not pass at 3pm does that mean we cant use that 9am area for that time. Basically what I am getting at is that if at 9am 80 percent of the...

Last reply: Lisa Fabula, Mar 27, 2015, 12:06 pm

Hello, I am documenting this

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Michael Russo on Jan 7, 2015, 6:47 pm

Hello,

I am documenting this credit using the simulation method. For many of the regularly occupied spaces, the rooms are above the 10fc requirement except for a small corner of the room...

Last reply: Lisa Fabula, Mar 26, 2015, 7:00 pm

Duration for online survey

EBOM-2009 SSc4: Alternative Commuting Transportation
posted by Jessica Hawley on Mar 26, 2015, 3:45 pm

We are planning on sending out an emailed link to an online electronic transportation survey on a Monday to survey our building's entire tenant population about their commute for the prior week (...

Last reply: Jessica Hawley, Mar 26, 2015, 5:09 pm

Is EAc2 affected by the use of the ACP calculation for EAc1?

CS-2009 EAc2: On-Site Renewable Energy
posted by Charlie Christenson on Mar 25, 2015, 6:32 pm

Working on a core & shell project that is planning to install a PV system sized to offset 1% of total building energy cost. Per the ACP calculation for EAc1, this 1% will be derated by the...

Last reply: Marcus Sheffer, Mar 26, 2015, 3:05 pm

Overhead Vegetation

NC-v4 SSc3: Open space
posted by Katherine Bachman on Mar 11, 2015, 2:38 pm

I am looking for clarification on what is considered to be 'overhead vegetation.' Per the LEED v4 Reference Guide, "a minimum of 25% of outdoor space must be vegetated or have overhead vegetated...

Last reply: Karin Miller, Mar 26, 2015, 12:01 pm

Point Structure For MRc5

NC-2009 MRc5: Regional Materials
posted by Robert Sherlock on Mar 17, 2015, 6:02 pm

Materials in particular, but that is an entirely different matter. See LEEDuser’s NCv4 MR forums for the Building Product Disclosure and Optimization credits.] Log in or register to post comments Robert...

Last reply: Jon Clifford, Mar 25, 2015, 10:49 pm

Location(s) and Wording of Signs

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Haley Duncan on Mar 25, 2015, 4:12 pm

I'd like a little more clarity on "posting information regarding the building's nonsmoking policy in prominent locations throughout the building."

We are a winery with a production...

Last reply: Ben Stanley, Mar 25, 2015, 4:53 pm