PIf2- Project Summary DetailsNC-2009 PIf2: Project Summary Detailsposted by Karly Michalowski on Mar 30, 2015, 11:41 am
What to do if project owner will not supply project budget? |
|
Where are PIf3-1 forms now?NC-2009 PIf3: Occupant and Usage Dataposted by Susan Di Giulio on Mar 4, 2015, 5:00 pm
Hi, Last reply: Deborah Lucking, Mar 27, 2015, 6:28 pm |
|
C&S Individual Project within a Campus RegistrationLEED Guidance for Campuses and Multiple Buildingsposted by Nate Steeber on Mar 27, 2015, 3:35 pm
This may be a very simple question, and perhaps our team is looking into this too deeply: We have a campus which we intend to use a Master Site with individual registrations (i.e. not a... Last reply: Deborah Lucking, Mar 27, 2015, 5:07 pm |
|
Areas passing at one time but not anotherNC-2009 IEQc8.1: Daylight and views - daylightposted by Lisa Fabula on Mar 26, 2015, 7:01 pm
If part of the building area passes at 9am but does not pass at 3pm does that mean we cant use that 9am area for that time. Basically what I am getting at is that if at 9am 80 percent of the... Last reply: Lisa Fabula, Mar 27, 2015, 12:06 pm |
|
Hello, I am documenting thisNC-2009 IEQc8.1: Daylight and views - daylightposted by Michael Russo on Jan 7, 2015, 6:47 pm
Hello, I am documenting this credit using the simulation method. For many of the regularly occupied spaces, the rooms are above the 10fc requirement except for a small corner of the room... Last reply: Lisa Fabula, Mar 26, 2015, 7:00 pm |
|
Duration for online surveyEBOM-2009 SSc4: Alternative Commuting Transportationposted by Jessica Hawley on Mar 26, 2015, 3:45 pm
We are planning on sending out an emailed link to an online electronic transportation survey on a Monday to survey our building's entire tenant population about their commute for the prior week (... Last reply: Jessica Hawley, Mar 26, 2015, 5:09 pm |
|
Is EAc2 affected by the use of the ACP calculation for EAc1?CS-2009 EAc2: On-Site Renewable Energyposted by Charlie Christenson on Mar 25, 2015, 6:32 pm
Working on a core & shell project that is planning to install a PV system sized to offset 1% of total building energy cost. Per the ACP calculation for EAc1, this 1% will be derated by the... Last reply: Marcus Sheffer, Mar 26, 2015, 3:05 pm |
|
Overhead VegetationNC-v4 SSc3: Open spaceposted by Katherine Bachman on Mar 11, 2015, 2:38 pm
I am looking for clarification on what is considered to be 'overhead vegetation.' Per the LEED v4 Reference Guide, "a minimum of 25% of outdoor space must be vegetated or have overhead vegetated... Last reply: Karin Miller, Mar 26, 2015, 12:01 pm |
|
Point Structure For MRc5NC-2009 MRc5: Regional Materialsposted by Robert Sherlock on Mar 17, 2015, 6:02 pmMaterials in particular, but that is an entirely different matter. See LEEDuser’s NCv4 MR forums for the Building Product Disclosure and Optimization credits.] Log in or register to post comments Robert... Last reply: Jon Clifford, Mar 25, 2015, 10:49 pm |
|
Location(s) and Wording of SignsEBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Haley Duncan on Mar 25, 2015, 4:12 pm
I'd like a little more clarity on "posting information regarding the building's nonsmoking policy in prominent locations throughout the building." We are a winery with a production... Last reply: Ben Stanley, Mar 25, 2015, 4:53 pm |