Log in
Forum » U.S. and Canada
Topic

Where do I upload the response report for Design Final Package?

NC-2009 EAp2: Minimum Energy Performance
posted by Matt Dem on May 21, 2015, 7:09 pm

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5879 thumbs up May 22, 2015- 9:34 am Answered in this forum- http://www.leeduser.com/topic/leed-reviews-leed-online-appeals-designcon... Log in or register to post comments ...

Last reply: Marcus Sheffer, May 22, 2015, 9:34 am

Can I defer any ID credit to submit it w/ construction package?

NC-2009 EAp2: Minimum Energy Performance
posted by Matt Dem on May 21, 2015, 7:08 pm

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5879 thumbs up May 22, 2015- 9:33 am Answered in this forum- http://www.leeduser.com/topic/leed-reviews-leed-online-appeals-designcon... Log in or register to post comments ...

Last reply: Marcus Sheffer, May 22, 2015, 9:33 am

Can I defer any ID credit to submit it w/ construction package?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Matt Dem on May 22, 2015, 8:34 am

Hi,

I previously filed an innovation credit with my design preliminary submission and received an comment from...

Last reply: Matt Dem, May 22, 2015, 9:23 am

Where do I upload the response report for Design Final Package?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Matt Dem on May 22, 2015, 8:35 am

We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by...

Last reply: Matt Dem, May 22, 2015, 9:22 am

Thermal Comfort Survey

NC-2009 IEQc7.2: Thermal comfort - verification
posted by Leed User on May 20, 2015, 2:48 am

I used the survey template provided on this site and was denied the credit saying it did not address all of the ASHRAE 55-2004 environmental variables (air speed, humidity, radiant temperature,...

Last reply: William Weaver, May 21, 2015, 6:08 pm

EAp2-4: Energy Star equipment: conversion from kWa to Watts

CI-2009 EAp2: Minimum Energy Performance
posted by Sarah Simchuk on May 19, 2015, 6:01 pm

I'm attempting to register the energy star equipment for my project under Table EAp2-4. The table asks for...

Last reply: Marcus Sheffer, May 20, 2015, 2:14 pm

Where to find the Ecologo-certified products?

EBOM-2009 IEQc3.3: Green cleaning - purchase of sustainable cleaning products and materials
posted by Helen Samuel on May 18, 2015, 9:10 pm

Now that Ecologo was acquired by UL, where can I find which products are Ecologo-certified? The UL website requires that you purchase their standards - but is there still some sort of database...

Last reply: Garrett Gerst, May 19, 2015, 9:35 am

Molok Containers for MRp1

CS-2009 MRp1: Storage and Collection of Recyclables
posted by Kristopher Lashley on Oct 17, 2014, 1:28 pm

We are looking to install a 5000L Molok recycling bin for a LEED 2009 CS building that will be a restaurant. According to the reference guide a 11.6m recycling area would be required. However we...

Last reply: Deborah Lucking, May 18, 2015, 4:12 pm

EV Ready acceptable?

CS-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Dylan Connelly on Apr 29, 2015, 1:21 pm

For Core & Shell projects - is installing 3% of the parking stalls to be EV ready acceptable to achieve these points? Idea is that the tenants will be responsible for installing the actual...

Last reply: Ellen Mitchell, May 18, 2015, 4:00 pm

EAc5 Option 3

NC-2009 EAc5: Measurement and Verification
posted by Sheryl Swartzle on May 18, 2015, 2:39 pm

Our client chose Option 2 on the PIf1 and the form has been approved. They have decided to pursue the 1 point available in EAc5 for choosing Option 1 in PIf1. Is it acceptable to update PIf1...

Last reply: Sheryl Swartzle, May 18, 2015, 3:34 pm