IEQp1NC-2009 IEQp1: Minimum indoor air quality performanceposted by Gordon Nielson on May 27, 2015, 4:04 pm
I am having troubles understanding what is a single zone system and a multiple-zone system and how to fill out the forms. Example: I have a zone with eight individual offices and corridor on a... Last reply: Gustavo De las Heras Izquierdo, May 27, 2015, 4:14 pm |
|
Campus Registration instead of Block?LEED Guidance for Campuses and Multiple Buildingsposted by Deborah Lucking on May 27, 2015, 12:45 pm
Hello all. Last reply: Eric Anderson, May 27, 2015, 1:05 pm |
|
Storm dry pond onsite overflows to stormceptorLEED Canada Forumposted by Marie-France Duthilleul on May 27, 2015, 10:49 am
Pre condition - open field and grass, a few trees. Post Condition: Development of a large military type vechicle building with loading docks and paved circulation drive area. Runoff from... |
|
90% controls for open office systems furnitureCI-2009 IEQc6.1: Controllability of systems - lightingposted by Brian VanAllen on May 27, 2015, 10:45 am
As the electrical design engineer; what is an acceptable means for me to meet the 90% controllability requirement on my drawings- for open offices? Please keep in mind this is for an open space... |
|
initial fit-out vs alteration?Retail-CI-v2009 PIf2: Project Summary Detailsposted by Andrew Bennett on May 26, 2015, 3:51 pm
What is the difference between initial fit-out and alteration square footages? We have an existing building in which we are not touching the exterior walls, but are renovating the interior,... |
|
Exterior Lighting Baseline vs ProposedNC-2009 EAp2: Minimum Energy Performanceposted by Maria Unruh on May 26, 2015, 3:35 pm
I'm trying to understand baseline exterior lighting versus the proposed. My calculations show that my proposed is less than my baseline, is this okay? What is USGBC looking for when they ask for... Last reply: Marcus Sheffer, May 26, 2015, 3:42 pm |
|
LEED for Neighborhood Development + Walkable Project SitePilot-Credits PC14: Walkable Streetsposted by Nikki Wildman on May 26, 2015, 12:18 pm
We just wanted to share a little of our experience with this credit. We were not originally intending to pursue any pilot credits for this project, but realized that we were located in a LEED for... |
|
Does an indoor sewage pit need exahust for EQc5?CS-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Kristopher Lashley on May 25, 2015, 7:29 pm
We have a project where there is a sewage pit located on floor P2 of the parking garage. It's in a separate enclosed room and the question is whether or not it needs to be exhausted and included... Last reply: Michelle Halle Stern, May 26, 2015, 9:34 am |
|
Can I lock the credits not to be touched by other team members?LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Matt Dem on May 22, 2015, 7:04 pm
Is there any feature in LEED online to lock the credits not to be changed by other team members ? I was about to submit for design final submission but then the owner postponed it for one... Last reply: Charles Nepps, May 24, 2015, 6:27 pm |
|
Filed (2)exemp. performance credit under (1) ID in case one failLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Matt Dem on May 22, 2015, 2:14 pm