Log in
Forum » Canada
Topic

LEED 2009 IEQc6.2 Thermal Comfort LEED Letter Template

NC-2009 IEQc6.2: Controllability of systems - thermal comfort
posted by Greg Snow on Sep 15, 2015, 8:06 am

Hi Everyone,

I was searching the toolkit to find samples of the LEED Letter Template for this Credit bu I couldn't . Any idea where I can find it?

What will be exactly listed...

Must non-potable water sources be used to earn IP credit?

NC-v4 IPc1: Integrative process
posted by Eesmyal Santos-Brault on Nov 6, 2014, 1:27 am

It appears that this credit can not be earned if a project does not meet some water demand through nonpotable sources. Can anyone confirm if not only consideration but actual use of nonpotable...

Last reply: Marcus Sheffer, Aug 17, 2015, 4:02 pm

KCMA-Reston, VA

NC-2009 MRc7: Certified Wood
posted by Lilian Seow on Mar 18, 2015, 2:11 pm

Does anyone have any comments on this KCMA ? Are they considered as USGBC approved equivalent for LEED V4?

http://www.kcma.org/
...

Last reply: Tristan Roberts, Jul 27, 2015, 4:39 pm

Credit Interpretation Request to support SS p1.

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Marie-France Duthilleul on Jun 3, 2015, 1:36 pm

When comparing your proposed...

EQc5- Parking Garages

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Kristopher Lashley on Jun 1, 2015, 4:56 pm

We have a multi story underground parking...

Storm dry pond onsite overflows to stormceptor

LEED Canada Forum
posted by Marie-France Duthilleul on May 27, 2015, 10:49 am

Pre condition - open field and grass, a few trees.

Post Condition: Development of a large military type vechicle building with loading docks and paved circulation drive area. Runoff from...

Does an indoor sewage pit need exahust for EQc5?

CS-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Kristopher Lashley on May 25, 2015, 7:29 pm

We have a project where there is a sewage pit located on floor P2 of the parking garage. It's in a separate enclosed room and the question is whether or not it needs to be exhausted and included...

Last reply: Michelle Halle Stern, May 26, 2015, 9:34 am

Molok Containers for MRp1

CS-2009 MRp1: Storage and Collection of Recyclables
posted by Kristopher Lashley on Oct 17, 2014, 1:28 pm

We are looking to install a 5000L Molok recycling bin for a LEED 2009 CS building that will be a restaurant. According to the reference guide a 11.6m recycling area would be required. However we...

Last reply: Deborah Lucking, May 18, 2015, 4:12 pm

calculating peak visitors for a multi-unit residential building

ND-v4 SLLc4: Bicycle facilities
posted by josee boutin on May 4, 2015, 5:04 pm

LEED 2009, would consider 10% of dwelling units or 4 (refer to SLLc4 equation 2) bicycle storage for visitors.
LEED v4 requires...

Last reply: Eliot Allen, May 12, 2015, 7:08 pm

ETS During Construction

NC-v4 EQp2: Environmental tobacco smoke control
posted by L W on Dec 16, 2014, 4:17 pm

Does the ETSC prerequisite apply during construction as well?

Last reply: Karin Miller, May 7, 2015, 6:09 pm