VOC Budget- DocumentationNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Deborah Ebersole on Jun 7, 2015, 4:50 pm
I am documenting the paints and coatings credit and I have one non-compliant paint that I need to offset. I want to do it with a single offset and I know that is allowable. I have gathered the... Last reply: Deborah Ebersole, Jun 8, 2015, 9:52 am |
|
Materials TrackingNC-2009 MRc4: Recycled Contentposted by Haley Duncan on Jun 4, 2015, 3:01 pm
Hi, regardless of whether we use the default budget or actual materials cost, must we track every item that falls under the applicable divisions? Or can we only track the items that comply w/ the... Last reply: Jon Clifford, Jun 5, 2015, 10:50 pm |
|
UFAD System: Underfloor plenum in baseline model?NC-2009 EAp2: Minimum Energy Performanceposted by Eric Webber on Jun 4, 2015, 3:38 pm
The proposed design is an Underfloor Air Distribution (UFAD) system utilizing an underfloor supply plenum and overhead return plenum. I am setting up the baseline model for LEED submission. The... Last reply: Eric Webber, Jun 5, 2015, 10:50 am |
|
Potential ID CreditNC-2009 IDc1: Innovation in Designposted by Ashley Bertling on Oct 1, 2014, 11:06 am
Good Morning! We'd like to use vegetable oil in our elevators instead of using hydraulic oil. Think this will count? The elevator technician said it will work just the same. Last reply: Lawrence Lile, Jun 4, 2015, 1:58 pm |
|
Resilient DesignNC-2009 IDc1: Innovation in Designposted by Deborah Lucking on Jun 3, 2015, 8:06 pm
We are required to address resilient design (e.g. against sea level rise, storm surge) in our project. Thanks! Last reply: Lawrence Lile, Jun 4, 2015, 1:50 pm |
|
Tenant FinishesNC-2009 MPR2: Must be a complete, permanent building or spaceposted by Ralph Bicknese on May 14, 2015, 6:00 pm
For a museum project registered under NCv2009 there will be a museum store and food service areas that will be "finished by tenant". These two spaces total approximately 5% of the total building... Last reply: Marcus Sheffer, Jun 4, 2015, 12:04 pm |
|
Can I lock the credits not to be touched by other team members?NC-2009 IDc1: Innovation in Designposted by Matt Dem on May 22, 2015, 7:00 pm
Hi, Is there any feature in LEED online to lock the credits not to be changed by other team members ? I was about to submit for design final submission but then the owner postponed it for... Last reply: Kath Williams, Jun 3, 2015, 8:24 pm |
|
Credit Interpretation Request to support SS p1.NC-2009 SSp1: Construction Activity Pollution Preventionposted by Marie-France Duthilleul on Jun 3, 2015, 1:36 pm
When comparing your proposed... |
|
Sports Practice Facility FTEs vs TransientsCalculating FTEsposted by David Browne on Apr 24, 2015, 3:27 pm
I am working on an indoor practice facility for a university Division 1 athletic program and am having a difficult time deciding how to enter FTEs and transients in a project information form. I... Last reply: Andrew Carman, Jun 3, 2015, 12:55 pm |
|
Can I defer any ID credit to submit it w/ construction package?NC-2009 IDc1: Innovation in Designposted by Matt Dem on May 21, 2015, 9:12 am
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from... Last reply: April Brown, Jun 1, 2015, 5:17 pm |