How FINAL is the Appeal?

General forums
posted by Mary Kay on Jul 8, 2015, 9:19 am

EAp2 was denied in our final design review. We are going to appeal this by addressing their comments and getting the energy savings above 10%. My question is, IF the appeal is denied, what then...

Exception to Vestibules in ASHRAE?

NC-2009 EAp2: Minimum Energy Performance
posted by Sara Greenwood on Jul 6, 2015, 5:29 pm

Hello, I am working on a project in...

Last reply: Marcus Sheffer, Jul 7, 2015, 10:25 am

District Energy Treatment in LEEDv4

NC-v4 EAp2: Minimum Energy Performance
posted by Cory Duggin on Jul 6, 2015, 4:59 pm

Is there any new guidance or published changes for modeling district energy loops in LEED v4? 90.1-2010 has expanded G3.1.1.1 and added G3.1.1.2-4, which is similar to how the LEED v2009...

Last reply: Marcus Sheffer, Jul 7, 2015, 10:21 am

62MZCalc

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Gordon Nielson on May 29, 2015, 6:22 pm

I noticed, I cannot enter rooms that require exhaust like restrooms and lockers. Do I exclude them on the excel spread sheet?

Last reply: Gustavo De las Heras Izquierdo, Jul 6, 2015, 6:21 pm

Kitchen Hoods with gas make-up air unit

NC-2009 EAc1: Optimize Energy Performance
posted by James Sullivan Jr. on Jul 6, 2015, 10:59 am

I've been trying to understand how does LEED treat kitchen exhaust hoods with make up unit(heating only) in the energy model. Is it process or non-process? The LEED reference guide 2009 v3,...

Last reply: Marcus Sheffer, Jul 6, 2015, 11:43 am

Is the credit for during construction, or after envelope is up?

NC-2009 IEQc3.1: Construction IAQ management plan - during construction
posted by Nelina Loiselle on Jul 1, 2015, 3:54 pm

We have an issue with a General Contractor on a project. There were poor conditions on the job site captured by images found at:...

Last reply: Nelina Loiselle, Jul 3, 2015, 2:18 pm

Fuel Stations for Shared Parking Lot Outside of LEED Boundary

NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Mary Kay on Apr 1, 2015, 3:56 pm

Our project has no new parking. We are on a campus where there is an existing parking lot adjacent to our building, but not within our LEED project boundary. There are 420 parking spaces in...

Last reply: LEEDme Lorenzi, Jul 3, 2015, 9:39 am

Protect Habitat on Campus

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by Marissa Hebert on Jun 26, 2015, 12:37 pm

Our project is a large medical campus with multiple buildings on a...

Last reply: April Brown, Jul 2, 2015, 3:04 pm

green cleaning term

NC-2009 IDc1: Innovation in Design
posted by Alfonzo Collins on Jul 1, 2015, 9:49 am

I received a comment on a design phase review that since this is a core & shell building, the owner has to either include green cleaning in the lease, or agree to control the cleaning for...

Last reply: Glen Phillips, Jul 1, 2015, 1:55 pm

Meter for Water Use in Laundry

Healthcare-v2009 WEc2: Water use reduction - measurement and verification
posted by Jon Penndorf on Jun 29, 2015, 11:03 am

Does the requirement to meter water used for laundry apply to all type of laundry equipment. For example would is apply to a residential type washing machine or only commercial grade? Thanks