Topic | Recent |
---|---|
Reopening one path of LEED-CI SSc1.2 in Construction ReviewLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Susan Di Giulio on Mar 27, 2015, 2:01 pm
In preliminary design review, we had attempted the Brownfields point, which is an option in SSc1.2.1, as well as 4 other points in that credit. The reviewer responded that we needed to show a... Last reply: Marcus Sheffer, Apr 28, 2015, 10:28 am |
|
VOC content for Shop applied finishesNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Jeremy Mendenhall on Jan 28, 2015, 10:40 am
We are new to the Leed program and wanting to make sure that we are following all of the guidelines, we have received some instruction however I'm trying to get confirmation that shop applied... Last reply: John Albrecht, Apr 27, 2015, 6:37 pm |
|
Floor Coating that Exceeds VOC LimitCS-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Amanda Atkinson on Mar 3, 2015, 2:15 pm
We have two CS v2009 projects in which a single epoxy floor coating exceeds the allowed... Last reply: Lyle Axelarris, Apr 27, 2015, 4:32 pm |
|
Uploads and deleting uploads- is the webinar posted somewhere?General forumsposted by Susan Di Giulio on Jan 19, 2015, 7:00 pm
I watched the webinar on how to use the new site on January 5, and I have been to the uploads page for the project in question but I can't remember how to upload docs and how to delete previously... Last reply: Jesse Robbins, Apr 27, 2015, 4:10 pm |
|
Plug Load ExemptionNC-2009 EAp2: Minimum Energy Performanceposted by Kim Lombard on Apr 23, 2015, 2:07 pminsight and comments. I very much appreciate this forum as a place where we can ask the questions concerning our project, even when the questions aren't popular ones. Like most projects this one has... Last reply: Kim Lombard, Apr 27, 2015, 8:43 am |
|
VOC Budget shortcut?NC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Rick Farrell on Apr 21, 2015, 12:37 pm
We are a... Last reply: Jon Clifford, Apr 23, 2015, 8:00 pm |
|
LEED/ASHRAE definition of a preheat coil?NC-2009 EAp2: Minimum Energy Performanceposted by Rock Ridolfi on Apr 22, 2015, 2:39 pm
The proposed system includes an ERV serving two packaged rooftop units. In the proposed, I’d like to eliminate the heating in the rooftop unit planned for morning warm-up operation but keep the... Last reply: Rock Ridolfi, Apr 23, 2015, 9:45 am |
|
Environmental Product Declaration cost markupGeneral forumsposted by Helene Lefkowitz on Apr 22, 2015, 2:29 pm
I am working on a v4 project and am trying to compare the price of materials with environmental product declarations (EPDs) vs. materials without EPDs. Is there a resource that shows price... |
|
Incomplete Space within LEED-CI Multi-Use BuildingCI-2009 PIf1: Minimum Program Requirementsposted by Sara Zoumbaris on Apr 22, 2015, 1:27 pm
Hello, We are working on a multi-use building that will house a hotel, residence, retail and a restaurant. The Hotel is the only portion working towards LEED Certification and is doing so under... |
|
Fueling Capacity- multiple stationsNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Garrett Ferguson on Apr 16, 2015, 11:58 am
In regards to the number of fueling stations, we have a charger that can charge 2 cars simultaneously (one plug on either side), and can reach 2 spots in either direction with a long cord. When... Last reply: Ellen Mitchell, Apr 22, 2015, 11:31 am |