Apparatus bay of Fire DepartmentNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Laura Charlier on Jul 9, 2015, 1:18 pm
HI there, Last reply: Jon Clifford, Jul 9, 2015, 8:36 pm |
|
Conveying systems now accepted for this creditNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Paula Melton on Jul 9, 2015, 7:27 pm
A recent Interpretation states that fire-suppressing equipment and conveying systems now... |
|
WaterSense Labeled ProductsNC-v4 WEp2: Indoor water use reductionposted by Rick Ellison on Jul 9, 2015, 4:58 pm
Reference Guide indicates WaterSense label requirements are mandatory in U.S. Right now the program for the WaterSense label on toilet flushometers is still in draft stage.... Last reply: Trista Brown, Jul 9, 2015, 7:13 pm |
|
Help w/ wrangling RECs.CS-2009 EAc2: On-Site Renewable Energyposted by Brian Salazar on May 19, 2015, 4:13 pm
Preface: LEED CS v3.0 Project in Massachusetts. Our project is designed to produce 16% on-site... Last reply: Marcus Sheffer, Jul 9, 2015, 5:05 pm |
|
Land disturbed vs. land supporting normal building operationHealthcare-v2009 MPR3: Must use a reasonable site boundaryposted by Michelle Bombeck on May 29, 2015, 4:08 pm
This question has been asked many times and I'm wondering if anyone has some more recent experience with a submittal. Our project is part of a 5 building campus to be built over the next few... Last reply: Kathryn West, Jul 9, 2015, 3:45 pm |
|
Questions about High-rise residential LEED Energy ModelingNC-2009 EAc1: Optimize Energy Performanceposted by Tommy Xing on Jul 1, 2015, 3:00 pm
Hi, I’m working on a High-rise residential LEED energy modeling project now. I have a question regarding the lighting. I’m using Energypro, and found out the lighting saving is zero from the... Last reply: Tommy Xing, Jul 9, 2015, 1:44 pm |
|
Compliant areaNC-2009 IEQc8.2: Daylight and views - viewsposted by David Browne on Jul 8, 2015, 3:32 pm
Perhaps this a dumb question, but would someone please clarify this for me? I am currently attempting this credit on two projects. In filling out the credit form, I have been using the floor area... Last reply: David Browne, Jul 9, 2015, 10:07 am |
|
HVAC system wasn't running during constructionNC-2009 IEQc3.1: Construction IAQ management plan - during constructionposted by Juanita Garcia on Jul 8, 2015, 6:50 pm
If the HVAC system wasn't running during construction of a new building, what is the requirement for documentation? Last reply: Francis Chua, Jul 8, 2015, 8:47 pm |
|
Exterior Shading DevicesNC-2009 IEQc8.2: Daylight and views - viewsposted by Sara Zoumbaris on Jun 26, 2015, 9:16 am
Hello LEED Users, I am working on a project with a majority of the exterior being composed of aluminum curtain wall. The project will be installing exterior shading devices on most of the... Last reply: Sara Zoumbaris, Jul 8, 2015, 4:50 pm |
|
Existing Central Plant and New buildingNC-2009 EAp2: Minimum Energy Performanceposted by Mital Patel on Jul 8, 2015, 10:16 am