Qualifying VRF SystemsCS-2009 EAc4: Enhanced Refrigerant Managementposted by Kristopher Lashley on Mar 10, 2015, 6:28 pm
We are working on a retail project and the mechanical designer insists on using a split VRF system. However the Mitsubishi systems he recommends do not meet the allowable refrigerant/ton set out... Last reply: Steve Loppnow, Dec 2, 2015, 6:37 pm |
|
right of ways adjacent to project?ND-Plan-v4 NPDc7: Transit facilitiesposted by Ian Scott on Nov 30, 2015, 3:09 pm
Given how a project boundary is supposed to be defined, either the project side of the right of way or the far side (non-project side) of the right-of-way, for this credit how do you deal with... Last reply: Eliot Allen, Nov 30, 2015, 6:13 pm |
|
FTE calculation and use associated for visitorsHealthcare-v2009 WEp1: Water Use Reductionposted by Annabelle Lam on Nov 25, 2015, 12:54 pmforum on occupancy for more things I've discussed with people there.) Log in or register to post comments 0 Vote up! ... Last reply: Susan Walter, Nov 30, 2015, 2:34 pm |
|
Does restaurant dishwashers qualify as waste water?NC-2009 WEc2: Innovative Wastewater Technologiesposted by Kristopher Lashley on Apr 16, 2015, 5:15 pm
I am wondering if I can include a restaurant dishwasher in my waste water calculations for WEc2? Last reply: Tristan Roberts, Nov 27, 2015, 2:34 pm |
|
Responsible personNC-2009 SSc1: Site Selectionposted by Lilian Seow on Nov 2, 2015, 2:34 pm
Who should be the responsible person signing the letter template for this credit? Unless the LEED Consultant is a qualified expert in site development relating to the prohibitions... Last reply: Tristan Roberts, Nov 27, 2015, 2:18 pm |
|
Number of bus stops and bus lines requiredNC-2009 SSc4.1: Alternative transportation - public transportation accessposted by Sarah Lavalliere on Oct 2, 2014, 3:57 pm
There seem to be a slight difference in the wording between the English version of the LEED 2009 CS Canada reference guide and its French translation. For one project, there are two bus lines... Last reply: Tristan Roberts, Nov 27, 2015, 1:10 pm |
|
Sub-mertersEBOM-v4 EAp2: Minimum Energy Performanceposted by Ann-Judith Belanger on Sep 2, 2015, 1:33 pm
Hi, we have a building that share some mechanical equipment with the adjacent building. We have a meter that measures the electricity of our building but the water tower consumption is included... Last reply: Ben Stanley, Sep 24, 2015, 1:33 pm |
|
MRc4 / MRc5- ConcreteLEED Canada Forumposted by Eric White on Sep 17, 2015, 4:06 pm
I have a question about the reporting of the cost of concrete between these two credits. Background: MRc4 - Recycled Content. Concrete manufacturers provide their mix design, $/m³... Last reply: Keith Robertson, Sep 24, 2015, 10:19 am |
|
LEED 2009 IEQc6.2 Thermal Comfort LEED Letter TemplateNC-2009 IEQc6.2: Controllability of systems - thermal comfortposted by Greg Snow on Sep 15, 2015, 8:06 am
Hi Everyone, I was searching the toolkit to find samples of the LEED Letter Template for this Credit bu I couldn't . Any idea where I can find it? What will be exactly listed... |
|
Must non-potable water sources be used to earn IP credit?NC-v4 IPc1: Integrative processposted by Eesmyal Santos-Brault on Nov 6, 2014, 1:27 am
It appears that this credit can not be earned if a project does not meet some water demand through nonpotable sources. Can anyone confirm if not only consideration but actual use of nonpotable... Last reply: Marcus Sheffer, Aug 17, 2015, 4:02 pm |