Topic | Recent |
---|---|
LEFEV Parking spots in shared garage w/ no dedicated spacesNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by ELIZABETH REITER on Mar 26, 2015, 12:58 pm
Regarding Option 1 of providing preferred parking for LEFEV for 5% of the total vehicle parking capacity of the site. Here is our issue/question. We have two buildings being submitted as a '... Last reply: Tak Louie, Aug 10, 2015, 3:27 pm |
|
LEED AP BD+C V4 EXAM in one month!General forumsposted by Moataz Sakkary on Aug 8, 2015, 10:08 am
Dear All Please guide me if any other way than studying the USGBC book, as I have to take me Exam by 15 of September???!! And what is exactly the eight tips companion workbook ?... Last reply: Paula Melton, Aug 10, 2015, 10:21 am |
|
Decorative LightingCI-2009 EAp2: Minimum Energy Performanceposted by Yaser Al Sharif on Aug 4, 2015, 4:22 am
Dear All, I have three questions: - We are applying for a commercial interior project, we received our final review (after prem. review) I received a new comment that wasn't... Last reply: Marcus Sheffer, Aug 4, 2015, 9:24 am |
|
Heat Recovery Counts?CS-2009 EAc2: On-Site Renewable Energyposted by Dina Ammar on Jul 28, 2015, 10:29 am
Hello, Will the energy harvested from a heat recovery equipment installed on a chiller and/or the fresh air system in our project count towards on-site... Last reply: Marcus Sheffer, Jul 28, 2015, 10:40 am |
|
Minimum building energy performanceND-Plan-v4 GIBp2: Minimum building energy performanceposted by sam Alfassy on Jul 13, 2015, 6:01 am
based on the fact that we are on a planning stage only, what would be the documentation that approves compliance to this requirement. Last reply: Eliot Allen, Jul 13, 2015, 11:23 am |
|
Stormwater Management PlanNC-2009 SSc6.2: Stormwater design - quality controlposted by Nisreen Alhussein on Jul 10, 2015, 8:11 am
I cant find clear cut for Stormwater Management Plan definition, i mean is it using both structural and non structural plans to achieve stormwater quality control? Last reply: Michael DeVuono, Jul 10, 2015, 8:29 am |
|
Gypsum board recycling resource, Saudi ArabiaNC-2009 MRc2: Construction Waste Managementposted by Shreepad Bandagi on Jun 30, 2015, 7:20 am
Wondering if anyone would have a resource for gypsum board recycling anywhere in Saudi Arabia. Thanks! |
|
the documentation languageNC-2009 SSc1: Site Selectionposted by ESRA OZKONUKSEVER on Jun 19, 2015, 2:44 am
hi everyone, Last reply: Melissa Kelly, Jun 25, 2015, 4:39 pm |
|
ASHRAE 55 Compliance in DubaiNC-2009 IEQc7.1: Thermal comfort - designposted by Annalise Reichert on Jun 16, 2015, 5:28 pm
I am working on a project in Dubai, the design engineer has performed a psychrometric analysis using 46.0°C (DB) and 29°C (WB) for climatic design cooling conditions. The project space is cooling... Last reply: Annalise Reichert, Jun 17, 2015, 11:54 am |
|
Core and Shell Scope & Tenant ScopeCS-2009 MRc5: Regional Materialsposted by Osama Hassan on May 23, 2015, 12:11 pm
Hi, Project is registered on Core & Shell rating System CS V2.0. When i was working on Regional Material Credit MRc5, I found two Options. The First one is Core and Shell Scope & the... |