Topic | Recent |
---|---|
Fire suppression systemsNC-v4 EAc6: Enhanced Refrigerant Managementposted by Jody Lee Potvin-Jones on Dec 12, 2014, 7:24 am
Hi, Are fire suppression systems and their OPD and... Last reply: Melissa Kelly, Apr 28, 2015, 4:39 pm |
|
Clarification on Solar Hot Water system eligibilityNC-2009 EAc2: On-Site Renewable Energyposted by Sasha Peters on Apr 20, 2015, 3:56 am
Please confirm if solar hot water system is eligible for EA credit 2 - On-Site Renewable Energy compliance considering that it is only used for water heating and not generating energy directly.... Last reply: Marcus Sheffer, Apr 20, 2015, 11:17 am |
|
Exhaust fan for chemical storageCI-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Yaser Al Sharif on Apr 13, 2015, 8:03 am
If We have chemical storage room with 69.4 ft square in Area in our building , i want to install one exhaust fan for this room to acheive credit requirements , how can i calculate minimum... Last reply: Michelle Halle Stern, Apr 13, 2015, 10:58 am |
|
Pressure loss calculationCI-2009 EAc1.3: Optimize energy performance - HVACposted by Yaser Al Sharif on Apr 8, 2015, 9:15 am
We are registed for commercial interior rating system , the system installed in our project is vrv system, in order to comply with optimize energy performance EAC1.3 , critical path supply duct... Last reply: Marcus Sheffer, Apr 9, 2015, 11:41 am |
|
OPR for LEED NDGeneral forumsposted by Philippa Cameron on Mar 30, 2015, 7:02 am
Looking through the requirements of LEED ND v4 I can only find reference to the... Last reply: Casey Studhalter, Apr 1, 2015, 2:18 pm |
|
School project- Group certificationLEED Guidance for Campuses and Multiple Buildingsposted by Maya Karkour on Mar 31, 2015, 8:46 am
Hello, Last reply: Deborah Lucking, Apr 1, 2015, 12:08 pm |
|
Occupancy ProofNC-2009 WEp1: Water Use Reductionposted by Deepika Parmar on Mar 22, 2015, 4:23 am
What is the documented proof required to be submitted to USGBC confirming on the Occupancy considered for our project. Will a letter from the client confirming on the... Last reply: Deepika Parmar, Mar 30, 2015, 3:09 am |
|
Storage Room with a small windowNC-2009 IEQp1: Minimum indoor air quality performanceposted by Orçun Özhelvaci on Mar 22, 2015, 3:40 pm
Hi everyone, Although I read almost all the comments related with the ventilation requirements of the storage rooms, I could not find the exact answer for my question. In our... Last reply: Dave Hubka, Mar 24, 2015, 9:39 am |
|
LEED ND with Buildings Under ConstructionGeneral forumsposted by Philippa Cameron on Mar 16, 2015, 5:32 am
If a site has a number of buildings already under construction and substantially complete, the design for most of which does not consider LEED requirements, and the client decides to pursue LEED... Last reply: Philippa Cameron, Mar 17, 2015, 2:20 am |
|
Email as Client Letter of CommitmentGeneral forumsposted by Nandan Tavkar on Mar 11, 2015, 5:41 am
Can client's emails be used in place of letter of commitment form client? Does USGBC accept emails as evidence? |