IEQc6.1- space type categoryNC-2009 IEQc6.1: Controllability of systems - lightingposted by S. Sachs on Oct 27, 2015, 8:07 am
For IEQc6.1-Controlability of Systems-Lighting, Do concourse spaces in a metro station fall into the regularly occupied space category? Last reply: Gustavo De las Heras Izquierdo, Nov 4, 2015, 10:21 pm |
|
Narrative for Option 2 Contractor confimrationNC-2009 IEQc3.1: Construction IAQ management plan - during constructionposted by Saud Abdul Rasheed on Oct 25, 2015, 10:40 am
Hi all, Last reply: Michelle Halle Stern, Oct 26, 2015, 9:54 am |
|
Preferred Parking and LEED Interpretation 10202NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Saud Abdul Rasheed on Oct 21, 2015, 12:54 pm
Hi all, Last reply: Saud Abdul Rasheed, Oct 24, 2015, 2:46 am |
|
Occupant Default Density vs. Actual densityCS-2009 IEQp1: Minimum indoor air quality performanceposted by Maya Karkour on Oct 9, 2015, 3:28 am
Hello, we are working on a C&S Mall project, Last reply: Dave Hubka, Oct 9, 2015, 8:56 am |
|
EPA TARGET FINDER RATING TOOL FOR A SCHOOL PROJECT IN KSASchools-2009 EAp2: Minimum Energy Performanceposted by VEL MUTHU on Sep 15, 2015, 11:58 am
Hi, I am currently working on a school project located in KSA. we are about to start the EA P2 and C1. I found that, it is a requirement to establish energy rating goal using EPA's target... Last reply: VEL MUTHU, Sep 19, 2015, 5:00 am |
|
Underground parking areas included?LEED Rating System Selectionposted by Maya Karkour on Sep 18, 2015, 7:08 amas parking garages) as part of a LEED project, see this discussion on the NC-2009 EAp2 forum: http://www.leeduser.com/comment/redirect/59216. Log in or register to post comments ... Last reply: Jon Clifford, Sep 18, 2015, 8:24 pm |
|
Submetering- Core & Shell 2009CS-2009 EAc5.2: Measurement and verification - tenant submeteringposted by Mohammad Haj-Ali on Sep 3, 2015, 5:02 am
We're designing an office building that the owner wants to provide flexibility in leasing, such that tenants can rent certain spaces in the floor, whole floors, or the whole building. The owner... Last reply: Marcus Sheffer, Sep 14, 2015, 9:06 am |
|
Assembly U-value CalculationNC-2009 EAp2: Minimum Energy Performanceposted by MURAT DOĞRU on Sep 4, 2015, 3:13 am
Dear all, Last reply: Jean Marais, Sep 7, 2015, 4:16 am |
|
LEED EBOM EligibilityEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Amgad Khattab on Aug 25, 2015, 7:11 am
We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED... Last reply: Michael Opitz, Aug 25, 2015, 9:18 am |
|
Temporary Materials- FormworkNC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Christopher Drew on Aug 18, 2015, 1:32 pm
The materials credits apply to components that are permanently installed in the building. However, the use of temporary construction materials, in particular formwork and formwork systems can be... Last reply: Paula Melton, Aug 19, 2015, 8:18 am |