Topic | Recent |
---|---|
The missing pointNC-2009 IEQc7.2: Thermal comfort - verificationposted by Cesar Ruiz on Oct 22, 2014, 3:40 pm
Greetings, I am developing a exclusively residential project, and thus I realize that this credit is not applicable for my project. however, this means that the maximum attainable score... Last reply: Cesar Ruiz, Oct 22, 2014, 3:50 pm |
|
Pressure Drop AdjustmentNC-2009 EAp2: Minimum Energy Performanceposted by Marina Andrade on Oct 17, 2014, 8:10 am
How do I set which the fan power limitation adjutment... Last reply: Francesco Passerini, Oct 22, 2014, 11:13 am |
|
LEED v4 rating systems being translated to PortugueseGeneral forumsposted by Tristan Roberts on Oct 20, 2014, 12:22 pm
USGBC is translating the LEED v4 rating systems to Chinese, Portuguese, and Spanish, and they passed us an advance copy to get your feedback! |
|
Sediment BasinNC-2009 SSp1: Construction Activity Pollution Preventionposted by Paula Hernandez on Oct 16, 2014, 10:32 am
Hello again, we are working on a project for which we are installing a sediment basin. According to EPA we could use the calculation of 3600 ft3 / acre drained to size it. Most of the drainage... Last reply: Paula Hernandez, Oct 16, 2014, 11:17 am |
|
External Lightning ExceptionsNC-2009 EAp2: Minimum Energy Performanceposted by Marina Andrade on Oct 14, 2014, 6:30 am
Hi everyone, It is necessary to prove the power... Last reply: Marina Andrade, Oct 14, 2014, 8:54 am |
|
Time Setpoint No Met & Setback TemperaturesNC-2009 EAp2: Minimum Energy Performanceposted by Marina Andrade on Oct 13, 2014, 9:52 am
Hi everyone! I've some doubts about this points. Whats is the setback temperatures? The time setpoint not met is calculated only in the occupied hours? I ask this because the air... Last reply: Marina Andrade, Oct 13, 2014, 1:09 pm |
|
Different HVAC system in baseline than proposed design- C&SCS-2009 EAc1: Optimize Energy Performanceposted by Ron Dean on Oct 7, 2014, 10:53 am
I am doing the energy model for a CS project. The baseline HVAC is a packaged rooftop (direct expansion) and the proposed design includes chillers and piping to each tenant space, but it doesn't... Last reply: Marcus Sheffer, Oct 7, 2014, 11:20 am |
|
Glazing specifications for existing buildingCS-2009 EAp2: Minimum Energy Performanceposted by João Costa on Sep 30, 2014, 11:01 am
Hi, I am developing a simulation (EAP2/LEED CS) for an existing building located in Rio de Janeiro. According with the Table G3.1.5, for the Baseline: "Existing Buildings: For... Last reply: Marcus Sheffer, Oct 4, 2014, 5:13 pm |
|
Mixed feelings about numberingGeneral forumsposted by Andres Schwarz on Sep 25, 2014, 2:36 pm
I have mixed feelings about this issue. Before we rush into the "yes/no" debate, we have to acknowledge first that there are two main groups of LEED users- the ones who are slightly involved, and... |