Topic | Recent |
---|---|
Manufactured products and packaging wasteLEED Canada Forumposted by Mike Eikermann on Oct 13, 2016, 2:55 pm
When creating a LEED document for a product line we need to include things like pre & post-consumer... Last reply: Guillaume Martel, Oct 14, 2016, 10:39 am |
|
(HERS) index score of at least 75ND-v2009 GIBc2: Building energy efficiencyposted by mugahid khatib on Sep 30, 2016, 11:49 am
for a residential LEED ND project seeking LEED ND Plan certification only, the Homes that are required to achieve at least 75 HERS index. is providing a RESNET HERS model enough ,... Last reply: Eliot Allen, Oct 1, 2016, 4:52 pm |
|
Functional Entry for Addition ProjectNC-v4 LTc5: Access to quality transitposted by Eric White on Aug 30, 2016, 6:25 pm
Our project is a four storey addition to an existing four storey building. There are a few doors that connect the addition and the existing building throughout its four storeys, along with... Last reply: Marilyn Specht, Aug 30, 2016, 7:26 pm |
|
Valuation of Recycled ContentCI-v4 MRc4: Building product disclosure and optimization - sourcing of raw materialsposted by Rebecca Pinto on Aug 23, 2016, 5:16 pm
I would like some clarification on how to calculate... Last reply: Paula Melton, Aug 25, 2016, 2:53 pm |
|
FIT Program vs LEED PointsLEED Canada Forumposted by Fayoke Banjo on Aug 23, 2016, 11:22 am
Hi, Last reply: John-David Hutchison, LEED AP BD+C, PMP, Aug 24, 2016, 12:46 pm |
|
SSc6.1 Design Storm IntervalNC-2009 SSc6.1: Stormwater design - quantity controlposted by Curtis Dorosh on Aug 4, 2016, 1:56 pm
Hi, I have noticed this question 2 times in the comments, but, I don't see an answer. On page 97 LEED 2009 guide they use 3 days or 72 hours as the design storm interval (between... Last reply: Curtis Dorosh, Aug 18, 2016, 11:32 am |
|
EQ P2 Option A- Environmental Tobacco Smoke (ETS) ControlEBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Vanessa W. on Aug 10, 2016, 9:36 am
Hi, We already have a Smoke & Vape-Free Environment Policy in place since last year which prohibits smoking in and on the grounds, way beyond the 25ft requirement for LEED. We want... Last reply: Vanessa W., Aug 15, 2016, 9:08 am |
|
RE: Vanpool Parking for a Core and ShellCS-2009 SSc4.4: Alternative transportation - parking capacityposted by Troy Glasner on Jul 5, 2016, 6:37 pm
Hello, I am working on a C&S project. The minimum parking capacity set by local zoning is 165 parking spots. The project has 165 spots exactly. The project size is 86000 sq ft. Van pool would... Last reply: Marilyn Specht, Jul 7, 2016, 7:08 pm |
|
CASE 1 NON RESIDENTIAL OPTION 3NC-2009 SSc4.4: Alternative transportation - parking capacityposted by Tim Gaidis on Jun 17, 2016, 4:08 pm
Hi there, Last reply: Marilyn Specht, Jun 23, 2016, 7:22 pm |
|
On site + Off-site restorationND-Plan-v4 SLLc8: Restoration of habitat or wetlands and water bodiesposted by Guillaume Martel on Jun 23, 2016, 3:16 pm
Our project is redevelopping a contaminated site (whole city block), which is part of a larger urban area belonging to the same owner. Within our project boundary and outside of it, we're... Last reply: Eliot Allen, Jun 23, 2016, 5:53 pm |