Topic | Recent |
---|---|
RE: Vanpool Parking for a Core and ShellCS-2009 SSc4.4: Alternative transportation - parking capacityposted by Troy Glasner on Jul 5, 2016, 6:37 pm
Hello, I am working on a C&S project. The minimum parking capacity set by local zoning is 165 parking spots. The project has 165 spots exactly. The project size is 86000 sq ft. Van pool would... Last reply: Marilyn Specht, Jul 7, 2016, 7:08 pm |
|
CASE 1 NON RESIDENTIAL OPTION 3NC-2009 SSc4.4: Alternative transportation - parking capacityposted by Tim Gaidis on Jun 17, 2016, 4:08 pm
Hi there, Last reply: Marilyn Specht, Jun 23, 2016, 7:22 pm |
|
On site + Off-site restorationND-Plan-v4 SLLc8: Restoration of habitat or wetlands and water bodiesposted by Guillaume Martel on Jun 23, 2016, 3:16 pm
Our project is redevelopping a contaminated site (whole city block), which is part of a larger urban area belonging to the same owner. Within our project boundary and outside of it, we're... Last reply: Eliot Allen, Jun 23, 2016, 5:53 pm |
|
OPTION 3 METHODNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Tim Gaidis on Jun 17, 2016, 4:10 pm
Hi there, we are working on a project in St John's, Newfoundland and was wondering: 1. For Option 3 does... |
|
Innovation in Design credit- Low Mercury LightingNC-2009 IDc1: Innovation in Designposted by Jordan Kirrane on May 19, 2016, 12:53 pm
Hi all, |
|
Alternate Transportation: SSc4.3 and SSc4.4NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Greg Snow on Sep 18, 2015, 9:40 am
Hi Everyone, I am filling out the LEED letter template for SSc4.3 and SSc4.4 and don't know which path/option I should check. The project is in Canada in a Campus; there are no parking... Last reply: Ara Massey, May 3, 2016, 1:32 pm |
|
Is a Rollout Mat considered a permanent entryway system?EBOM-v4 EQc2: Enhanced indoor air quality strategiesposted by Tim Nabholz on Mar 24, 2016, 12:32 pm
According to the language provided for the credit: Last reply: Trista Brown, Mar 24, 2016, 5:08 pm |
|
ASHRAE 62.1NC-2009 IEQp1: Minimum indoor air quality performanceposted by Kristopher Lashley on Mar 16, 2016, 1:42 pm
We have an electrical room on site that is not attached to the main building and will hold the electrical equipment for a diesel fueling station. Someone will be in the room twice a day just to... Last reply: Dave Hubka, Mar 16, 2016, 1:56 pm |
|
Interview Room with 2 seatsNC-2009 IEQc6.2: Controllability of systems - thermal comfortposted by Maher Hemod on Mar 2, 2016, 4:59 pm
what dose consider an interview room with 2 seats in a hospital project, is it individual occupant space or shared multi occupant ? Last reply: Lauren Sparandara, Mar 3, 2016, 12:10 pm |
|
Hydrogen ProductionNC-2009 EAc2: On-Site Renewable Energyposted by Kristopher Lashley on Feb 29, 2016, 3:24 pm
Hi, Last reply: Hernando Miranda, Mar 1, 2016, 11:24 am |