Log in
Forum » Canada
Topic

RE: Vanpool Parking for a Core and Shell

CS-2009 SSc4.4: Alternative transportation - parking capacity
posted by Troy Glasner on Jul 5, 2016, 6:37 pm

Hello, I am working on a C&S project. The minimum parking capacity set by local zoning is 165 parking spots. The project has 165 spots exactly. The project size is 86000 sq ft. Van pool would...

Last reply: Marilyn Specht, Jul 7, 2016, 7:08 pm

CASE 1 NON RESIDENTIAL OPTION 3

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Tim Gaidis on Jun 17, 2016, 4:08 pm

Hi there,
For our project in StJohn's, Newfoundland, we are providing 3 Barrier Free spaces and 3 Maintenance Parking spaces (for maintenance facility users to use, but are not always used...

Last reply: Marilyn Specht, Jun 23, 2016, 7:22 pm

On site + Off-site restoration

ND-Plan-v4 SLLc8: Restoration of habitat or wetlands and water bodies
posted by Guillaume Martel on Jun 23, 2016, 3:16 pm

Our project is redevelopping a contaminated site (whole city block), which is part of a larger urban area belonging to the same owner.

Within our project boundary and outside of it, we're...

Last reply: Eliot Allen, Jun 23, 2016, 5:53 pm

OPTION 3 METHOD

NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Tim Gaidis on Jun 17, 2016, 4:10 pm

Hi there, we are working on a project in St John's, Newfoundland and was wondering:

1. For Option 3 does...

Innovation in Design credit- Low Mercury Lighting

NC-2009 IDc1: Innovation in Design
posted by Jordan Kirrane on May 19, 2016, 12:53 pm

Hi all,
I have a data centre in Montreal that is being assessed against BD+C NC v 2009. I am looking at targeting an Innovation in Design credit for "Purchasing - lamps OM v4 MR Credit"....

Alternate Transportation: SSc4.3 and SSc4.4

NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Greg Snow on Sep 18, 2015, 9:40 am

Hi Everyone,

I am filling out the LEED letter template for SSc4.3 and SSc4.4 and don't know which path/option I should check. The project is in Canada in a Campus; there are no parking...

Last reply: Ara Massey, May 3, 2016, 1:32 pm

Is a Rollout Mat considered a permanent entryway system?

EBOM-v4 EQc2: Enhanced indoor air quality strategies
posted by Tim Nabholz on Mar 24, 2016, 12:32 pm

According to the language provided for the credit:
"Acceptable entryway systems include permanently installed grates, grilles, slotted systems that allow for cleaning underneath, rollout...

Last reply: Trista Brown, Mar 24, 2016, 5:08 pm

ASHRAE 62.1

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Kristopher Lashley on Mar 16, 2016, 1:42 pm

We have an electrical room on site that is not attached to the main building and will hold the electrical equipment for a diesel fueling station. Someone will be in the room twice a day just to...

Last reply: Dave Hubka, Mar 16, 2016, 1:56 pm

Interview Room with 2 seats

NC-2009 IEQc6.2: Controllability of systems - thermal comfort
posted by Maher Hemod on Mar 2, 2016, 4:59 pm

what dose consider an interview room with 2 seats in a hospital project, is it individual occupant space or shared multi occupant ?
Thanks in advance.

Last reply: Lauren Sparandara, Mar 3, 2016, 12:10 pm

Hydrogen Production

NC-2009 EAc2: On-Site Renewable Energy
posted by Kristopher Lashley on Feb 29, 2016, 3:24 pm

Hi,
We are looking to install an on-site hydrogen production station that will produce hydrogen that is then sent to hydrogen charging stations around the project to refuel and run a fleet...

Last reply: Hernando Miranda, Mar 1, 2016, 11:24 am