Topic | Recent |
---|---|
On-site CHP ModelingNC-2009 EAp2: Minimum Energy Performanceposted by MURAT DOĞRU on Mar 9, 2016, 6:26 am
Dear all, Last reply: MURAT DOĞRU, Mar 10, 2016, 3:05 am |
|
Need your Advise- Urgent (Sports Hall Project)NC-2009 EAp2: Minimum Energy Performanceposted by SSN Energy Model on Feb 11, 2016, 6:31 am
Hi, We are doing Energy Simulation for Sports Hall Project (G+1 Story building). Sports hall having single playing court and it will be used for various sports activities. Sometimes, it... Last reply: Marcus Sheffer, Mar 7, 2016, 3:54 pm |
|
Alternative Standard to ASHRAE 90.1-2007 Appendix GNC-2009 EAp2: Minimum Energy Performanceposted by Jourdan Younis on Feb 23, 2016, 6:04 am
We have a project that consists of two connected buildings: an admin building and a factory building. The total area for the buildings is greater than 150,000 sq ft, therefore system 8 applies to... Last reply: Santiago Rodriguez, Mar 3, 2016, 2:21 pm |
|
PU Foam Insulation- Emission Test ISO16000-11NC-v4 EQc2: Low-emitting materialsposted by Jovelyn Lagunday on Feb 21, 2016, 2:27 pm
General emissions requirements as per LEEDV4 -... Last reply: Michelle Halle Stern, Feb 23, 2016, 1:49 pm |
|
Process Energy Exceptional CalculationNC-2009 EAp2: Minimum Energy Performanceposted by Maya Karkour on Feb 4, 2016, 9:37 amMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up February 4, 2016- 10:33 am I think you might be required to use the Healthcare version of LEED and this is an NC forum. That aside, for all exceptional calculations related to claiming process load savings it is the responsibility of the project team to justify the baseline used for comparison. It should... Last reply: Marcus Sheffer, Feb 5, 2016, 3:15 pm |
|
Painting or Coating for Steel StructureCS-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Ali Soufan on Sep 10, 2015, 1:28 pm
Hi Last reply: Jon Clifford, Jan 30, 2016, 10:51 pm |
|
Supply fixtures to tenants without installationCS-2009 WEp1: Water Use Reductionposted by Ali Soufan on Jun 9, 2015, 2:24 am
Would it be possible to claim performance improvement by supplying the toilet fixtures for all tenants without installing them? Last reply: Tristan Roberts, Jan 22, 2016, 11:45 am |
|
No LEED ND v4 RP credits on LEED website?ND-v4 RPc1: Regional Priorityposted by Nate Tsang on Apr 24, 2015, 12:37 pm
There are no LEED v4 ND RP credits on the regional priority credit lookup on the USGBC website. Can these projects receive RP credits? If so, should they target LEED v3 ND RP or LEED v4 BD+C RP... Last reply: Casey Studhalter, Jan 14, 2016, 2:50 pm |
|
Reuse of aggregatesEBOM-2009 MRc7: Solid waste management - ongoing consumablesposted by Fareed Alghimlas on Jan 7, 2016, 4:36 am
The building our team is trying to get it LEED certified has originally a shallow swimming pool with stones and aggregates in it for decorative purposes, during the performance period, the... Last reply: Trista Brown, Jan 10, 2016, 5:47 pm |
|
Shipping RoomNC-2009 IEQc6.2: Controllability of systems - thermal comfortposted by Omar Elrawy on Mar 17, 2015, 11:44 am
Dear All, Last reply: Lauren Sparandara, Jan 6, 2016, 1:48 pm |