LEED 2009 for New Construct, Optimize Energy Perform- EA CR 1

NC-2009 EAc1: Optimize Energy Performance
posted by John Harrington on Jul 29, 2011, 11:30 am

I have two buidings on the same site/project boundry.

Do I model the two buildings as one building? If I did two seperate models I am not sure how I would show this on the LEED Credit...

Last reply: Marcus Sheffer, Sep 19, 2011, 4:40 pm

Landscape lighting

NC-2009 EAc1: Optimize Energy Performance
posted by Julien Daclin on Sep 13, 2011, 1:46 pm

Appendix G (Table 3.1) states that lighting power for building facades has to be modeled in the energy simulation. However, it is not clear if landscape lighting should also be taken into account...

Last reply: Marcus Sheffer, Sep 19, 2011, 4:39 pm

Cost of Renewable Energy

NC-2009 EAc1: Optimize Energy Performance
posted by Gregg Achtenhagen on May 26, 2011, 11:57 am

I am going to be modeling a building that plans on buying landfill gas to burn in boilers which will contribute to EAc2.

I know I can double-dip on EAc1 and EAc2, so do I need to include...

Last reply: Christopher Schaffner, Sep 8, 2011, 1:25 pm

Baseline Virtual Energy Rate

NC-2009 EAc1: Optimize Energy Performance
posted by Nick Morgan on Jul 15, 2011, 12:14 pm

I am in the process of submitting the LEED templates (2009 NC) for EAp2/EAc1.

The building in question has been modeled using Energy Pro and has calculated a baseline virtual energy rate...

Last reply: Christopher Schaffner, Sep 8, 2011, 11:11 am

Modeling OA for naturally ventilated space

NC-2009 EAc1: Optimize Energy Performance
posted by Orlin Velinov, PE on Jul 20, 2011, 1:20 am

We have a project that is a parking garage...

Last reply: Christopher Schaffner, Sep 8, 2011, 11:04 am

EAC1- Day Lighting & Other Lighitng controls input

NC-2009 EAc1: Optimize Energy Performance
posted by susan eguia on Jul 28, 2011, 1:44 pm

Hi,

We've only done the mechanical portion for this project but the client assigned to us the EAc1 credits. So, we're just coordinating whatever electrical information we need to complete...

Last reply: Christopher Schaffner, Sep 8, 2011, 11:03 am

Comparing Process Pumping between Baseline and Proposed

NC-2009 EAc1: Optimize Energy Performance
posted by Evelyn Dicks, EI, CxA on Jul 31, 2011, 11:44 am

I am working on a lab building near the coast where seawater is pumped into the building for use by researchers. The system gets complex, but essentially we are controlling these large "raw"...

Last reply: Christopher Schaffner, Sep 8, 2011, 11:00 am

Modeling PCW Heat Rejection for DES vs. System 5 (DX Cooling)

NC-2009 EAc1: Optimize Energy Performance
posted by Evelyn Dicks, EI, CxA on Jul 31, 2011, 1:14 pm

I am working on a building that supplies process cooling water (PCW) to lab spaces. The PCW rejects its heat through a heat exchanger to the chilled water system from a district energy plant....

Last reply: Christopher Schaffner, Sep 8, 2011, 10:54 am

Energy Modeling: Dome (Design) vs. Dome (Baseline)?

NC-2009 EAc1: Optimize Energy Performance
posted by Nelina Loiselle on Aug 8, 2011, 5:14 pm

I am working on the LEED Certification of a 23,000sq.ft. concrete "business continuity" dome. It is literally a concrete dome. This building type was selected because it is resilient to hurricane...

Last reply: Christopher Schaffner, Sep 8, 2011, 10:49 am

Baseline HVAC Equip Vs. Proposed HVAC Equip

NC-2009 EAc1: Optimize Energy Performance
posted by Greengrade User on Aug 17, 2011, 10:07 am

Question:
Does the HVAC system for the baseline have to be the same type as the proposed design HVAC equipment?
(ie. could you use a...

Last reply: Christopher Schaffner, Sep 8, 2011, 10:42 am