LEED final review...past due?LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by John Stouffer on Sep 22, 2014, 3:04 pm
Is LEED final review typically late? The anticipated date of return was 10 days ago. We're getting a little nervous. We did have a clarification, but that was returned in a timely manner. Is... Last reply: John Stouffer, Oct 1, 2014, 5:19 pm |
|
Site lighting calculationsCS-2009 EAp2: Minimum Energy Performanceposted by charles bell on Sep 29, 2014, 9:33 am
We have a campus projects with three relatively equal size multi-story buildings. The owner will manage the three buildings separately. Each project will pay for their own utilities. The power... Last reply: Marcus Sheffer, Sep 30, 2014, 3:51 pm |
|
Credit 3.2 option 2NC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Michael Schrantz on Sep 30, 2014, 1:57 pm
To whoever can help me! I am bidding on a two-story building. The first floor is 33,000 ft.² and the second floor is a little over 18,000 ft.² Last reply: David Biggs, Sep 30, 2014, 2:41 pm |
|
FTE Consistency Pertaining to IEQp1NC-2009 IEQp1: Minimum indoor air quality performanceposted by Spencer Eldredge on Sep 25, 2014, 2:49 pm
The need to keep FTEs consistent through all credits is stressed though in the case of IEQp1 where for Mechanical Ventilation, table IEQp1-3, for code compliance based on square footage, the Pz (... Last reply: Hernando Miranda, Sep 29, 2014, 4:17 pm |
|
Using EBOM credit as an ID credit for NC 2009 submittalEBOM-2009 IEQc3.4: Green cleaning - sustainable cleaning equipmentposted by Jessica Tyler on Sep 22, 2014, 5:17 pm
I would like to use this credit as an Innovation and Design credit for a New Construction (NC 2009) submittal. My project is obviously set up as a NC format online, and I do not have access to... Last reply: CT G, Sep 26, 2014, 9:13 am |
|
Need for consistent numbering system across all rating systemsGeneral forumsposted by Lyle Axelarris on Sep 25, 2014, 2:21 pm
I definitely like having credit numbers as they save a lot of time in communication and reference. There have been some numbering issues, as mentioned above and I was hoping v4 would be used as... Last reply: Jon Clifford, Sep 25, 2014, 6:20 pm |
|
SSc4.3 Option 2: How long must charge stations be installed?NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Kimberlyn Caoagas on Sep 25, 2014, 3:16 pm
How long must charge stations be installed in order to be credit compliant? How is the project affected if clients remove charge stations if they are not being used? Last reply: Kimberlyn Caoagas, Sep 25, 2014, 3:49 pm |
|
Expansion joints-LEED for schools v2009Schools-2009 IEQc9: Enhanced Acoustical Performanceposted by Stephanie Santiago on Sep 24, 2014, 10:54 am
For the expansion joints being used in a LEED project for schools v2009, do they have to meet the... Last reply: Daniel Hicks, Sep 24, 2014, 5:23 pm |
|
BTU Metering for Existing HVACCI-2009 EAc3: Measurement and Verificationposted by Jareb Ketay on Sep 23, 2014, 1:41 pm
I have a tenant renovation project occupying 1 story of an existing 10 story building ( Last reply: Marcus Sheffer, Sep 23, 2014, 3:13 pm |
|
LEED Site Boundary- Campus- easement for utilitiesHealthcare-v2009 MPR3: Must use a reasonable site boundaryposted by Michele Helou on Sep 22, 2014, 10:09 pm
'The LEED project boundary must include .......all land that was or will be disturbed for the purpose of undertaking the LEED project.' What if a small section an adjacent campus parking... |