An unusual situation with Recycling TicketsNC-2009 MRc2: Construction Waste Managementposted by Christine Castellano on Oct 20, 2014, 11:32 am
As the general contractor on a recently completed LEED project, all of the tickets I've received from the off-site waste separation facility listed the tonnage diverted by item, i.e., concrete,... Last reply: RETIRED, Oct 20, 2014, 12:09 pm |
|
Fire Department Practice BurnNC-2009 MRc2: Construction Waste Managementposted by Brian Leet on Sep 29, 2014, 4:43 pm
We have a project on a large campus which has involved demolition of over a dozen buildings. There has been a strong focus on... Last reply: Brian Leet, Oct 20, 2014, 12:02 pm |
|
Summary marked "N"NC-2009 PIf3: Occupant and Usage Dataposted by Ryan Kurlbaum on Oct 20, 2014, 11:54 am
We have completed this form and for some reason continue to have the "summary" box marked as "N". We do not have additional details to add - any ideas on what could be missing for us to complete... |
|
Masonry Flash MasticNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Chris Moore on Oct 13, 2014, 3:31 pm
Our masonry contractor submitted... Last reply: Jon Clifford, Oct 20, 2014, 11:43 am |
|
Pot washing sinkNC-2009 WEp1: Water Use Reductionposted by Christine Harvey on Oct 17, 2014, 3:21 pm
I saw a comment on this site that implied the water used for pot washing sinks and kitchen food prep sinks can be excluded from the calculations, can someone verify that for me? I don't see... Last reply: Michelle Rosenberger, Oct 20, 2014, 11:23 am |
|
Ventilation EffectivenessGeneral forumsposted by Dustin Balton on Oct 20, 2014, 10:26 am
I am working for a client who has a variable refrigerant HVAC system with a separate fully condition ventilator supplying fresh air. They are over budget and the contractor is proposing ducting... |
|
No autosizing of equipment on proposed?NC-2009 EAp2: Minimum Energy Performanceposted by Saju Varghese on Oct 15, 2014, 4:30 pmat different flow rates, then the answere is beyond the scope of this forum (hint: the flow impacts on the hydronic pressure that the fan must overcome in the system and directly impacts the power...check out your software's user forum). Log in or register to post comments Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up October 20, 2014- 7:13 am Appendix G requires... Last reply: Marcus Sheffer, Oct 20, 2014, 7:13 am |
|
Submitting design prereq. credits during construction reviewLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by kelly ryan on Oct 17, 2014, 12:29 pm
Is it acceptable to submit design prerequisite credits during the construction review phase? Last reply: TODD REED, Oct 17, 2014, 12:45 pm |
|
Cost!General forumsposted by Nelina Loiselle on Oct 15, 2014, 12:10 pm
The cost is $6,000 a year! For a plaque! None of our clients will pay that kind of money, especially since it may actually result in a lower score and you'd still have to hire LEED consultants to... Last reply: Scot Horst, Oct 16, 2014, 4:20 pm |
|
Regularly Occupied Space + Basement View AccessNC-2009 IEQc8.2: Daylight and views - viewsposted by Ryan Kurlbaum on Oct 15, 2014, 4:54 pm
We are doing a zero-lot line project in NYC on a very narrow site. The program is located on 2 floors each with a large performance space located in toward the rear of the lot. This is a 2... Last reply: TODD REED, Oct 16, 2014, 8:22 am |