Topic | Recent |
---|---|
appeal timelineLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Therese Thompson on Oct 27, 2014, 2:17 pm
We've received our final review report and will have to appeal a decision on EAp2, which also affects two credits. Can anyone tell me how long we should expect to wait for the results of this... Last reply: Therese Thompson, Oct 28, 2014, 7:43 pm |
|
supplemental heating systemCS-2009 EAp2: Minimum Energy Performanceposted by Alfonzo Collins on Oct 28, 2014, 12:10 pm
I am working on a high-rise residential building with VRF. The building envelope is heavily glass, so the owner has decided to also install a hydronic heating system at the building perimeter.... Last reply: Alfonzo Collins, Oct 28, 2014, 12:15 pm |
|
Default recycled content for Aluminum or Glass?CI-2009 MRc4: Recycled Contentposted by Charles Chaloeicheep on Oct 27, 2014, 7:53 pm
Hello, My project is using aluminum and glass fabrications made in China and neither fabricators has any information about the... Last reply: Tristan Roberts, Oct 27, 2014, 8:25 pm |
|
Occupancy for indoor/outdoor building typesNC-2009 PIf3: Occupant and Usage Dataposted by Keelan Kaiser on Sep 19, 2014, 11:52 am
We have a project that is a large outdoor amphitheater, with a roof, but an unconditioned outdoor space. It has an adjoining building for all of the back of house uses. When calculating the... Last reply: Erika Duran, Oct 27, 2014, 4:56 pm |
|
Do I qualify? Lots of details, hopefully helpful How and whom...LEED for Homes (LEED-H) Forumposted by Bruce Johnson on Oct 25, 2014, 3:03 am
We have been working on a project for a couple of years. From the ground up, I have been trying to make green choices, however, we did not have any "Integrated Project Planning" Last reply: Brett Little, Oct 27, 2014, 12:25 pm |
|
Commissioning of renewable energy systemsNC-2009 EAc3: Enhanced Commissioningposted by Peg Manuel on Oct 22, 2014, 12:50 pm
EAc3 requires the individual serving as the... Last reply: Scott Bowman, Oct 25, 2014, 10:37 pm |
|
LEED: Homes eligibility?LEED for Homes (LEED-H) Forumposted by Erica Downs on Oct 22, 2014, 12:01 am
Hello - We are starting major construction of our home, consisting of a gut-reno of the first floor; addition of a 2nd floor plus attic and porch; new mechanical systems, plumbing, electrical,... Last reply: Erica Downs, Oct 23, 2014, 3:54 pm |
|
Chilled water pumping head > baseline designNC-2009 EAp2: Minimum Energy Performanceposted by Victoria Watson on Oct 16, 2014, 9:25 pm
Hi, h Has anyone come across issues with the chilled water pumps in the proposed and baseline building W/gpm being very different. It seems if you have a large building you will... Last reply: Marcus Sheffer, Oct 23, 2014, 11:08 am |
|
New ProductNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Stefanie Smith on Sep 22, 2014, 4:18 pm
Hello, Last reply: Lauren Sparandara, Oct 23, 2014, 10:57 am |
|
Modeling Laboratory SystemsNC-2009 EAc1: Optimize Energy Performanceposted by Victoria Watson on Oct 22, 2014, 7:15 pm
Hi, I am starting work on a laboratory building and have been looking at the standards to see how they apply. The project will use both an ASHRAE 90.1 2007 and 2010 baseline building (one of... Last reply: Julia Weatherby, Oct 23, 2014, 7:44 am |