Log in
Forum » Canada
Topic

Different route numbers on same route

NC-v4 LTc5: Access to quality transit
posted by Chad Thurlow on Aug 31, 2017, 11:38 am

Hello

A couple questions:

Do I count the total number of stops in one direction listed by the transit authority? Or the number of stops starting from the nearest stop to the project...

Last reply: Kimberly Schlaepfer, Sep 1, 2017, 12:41 pm

FAR for parks with pavillion

NC-v4 SSc3: Open space
posted by nancy picard on Jun 22, 2017, 3:01 pm

I would like to know if there have ever been special considerations for the...

Last reply: emily reese moody, Aug 30, 2017, 10:02 pm

Structural Wood Components- Glulam

Schools-NC-v4 EQc2: Low emitting materials
posted by Kaeryn Gregory on Jul 27, 2017, 12:18 pm

Is...

Last reply: Reinhard Oppl, Aug 30, 2017, 4:36 pm

Credit Points

Healthcare-v4 IPc1: Integrative process
posted by Christine Chow on Aug 29, 2017, 7:20 pm

The Reference Guide shows 1-5 points are available for this credit under the Hospitality and Healthcare rating systems. Is it explained anywhere how the variation of points is awarded?

Last reply: Tristan Roberts, Aug 30, 2017, 10:17 am

Heated Bus Storage

NC-v4 EAc2: Optimize Energy Performance
posted by Victoria Watson on Aug 28, 2017, 12:55 am

Hi,
I am trying to work out the best way to model a heated (cold climate) bus storage facility in the baseline. The proposed has supply fans and exhaust fans with heat recovery and a...

Last reply: Victoria Watson, Aug 29, 2017, 11:25 pm

Lease requirements for this credit

CS-2009 IEQc2: Increased Ventilation
posted by Troy Glasner on Jul 21, 2016, 1:03 pm

Hi, I am just wondering what specific lease requirement language would be needed for this credit. Or, is it possible to just design for it and ensure that the ventilation rates are adjusted when...

Last reply: Ashwini Arun, Aug 29, 2017, 2:32 pm

Projects with little landscaped area (prescriptive only?)

Homes-v4 WEc1: Total water use
posted by Tim Nabholz on Jul 13, 2017, 2:54 pm

It seems that for projects with small amounts of landscape areas, which many Homes: Midrise projects would be, the performance path doesn't seem to make sense.

In my case, I have a...

Last reply: Ian Johnson, Aug 28, 2017, 9:50 am

At the discretion of the permit holder

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Ashley Hu on Jul 12, 2017, 7:52 pm

Hi Everyone,

here's another question.

The campus guidance from the LEED Canada Reference Guide states the following:

" It is acceptable to achieve a Campus Shared...

Last reply: Tristan Roberts, Aug 26, 2017, 5:38 pm

Customer Use of Restrooms

Retail-CI-v4 WEc1: Indoor water use reduction
posted by Mélanie Pitre on Mar 27, 2017, 2:52 pm

Working on a retail project, we have the same case as described by Donny Goris Kolb in his comment : the store's restrooms are intended for employee use, but employees are directed to grant...

Last reply: Tristan Roberts, Aug 26, 2017, 12:21 pm

25ft of entrace located near corner of building

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Mary Grace Wong on Sep 24, 2014, 2:17 pm

Does the 25ft referring to a straight line measurement? Or, it's following the building footprint? Or, as a radius?

The reason of this question being an existing ashtray is located at the...

Last reply: Tristan Roberts, Aug 26, 2017, 11:39 am