Covered bicycle racks for dormitories building in a universityNC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by soha yamani on Jan 31, 2017, 4:51 am
I am working on a university campus project which includes over twelve buildings and a dormitories building, now regarding SSC4.2 credit we have provided the required number of bicycle racks for... Last reply: soha yamani, Jan 31, 2017, 1:46 pm |
|
LEED 2009 IEQc4.2NC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Mario S. on Jan 31, 2017, 10:57 am
We have received a datasheet for a floor coating that do not state the... Last reply: John-David Hutchison, LEED AP BD+C, PMP, Jan 31, 2017, 11:17 am |
|
Concerning SignatoriesNC-2009 EAc3: Enhanced Commissioningposted by Omar Elrawy on Jan 23, 2017, 8:12 am
I need to know if the two signatories on the EA CREDIT 3: ENHANCED COMMISSIONING - LEEDOnline form are to be signed by the... Last reply: Scott Bowman, Jan 30, 2017, 5:55 pm |
|
Platted Lots by GovernmentNC-v4 LTc2: Sensitive land protectionposted by soha yamani on Dec 31, 2016, 9:44 am
Dear All, Last reply: Tristan Roberts, Jan 23, 2017, 3:16 pm |
|
Technical service building- Healthcare v2009NC-2009 MPR2: Must be a complete, permanent building or spaceposted by Jonathan Landry on Jan 18, 2017, 1:24 pm
Hello fellow LEED experts, my client is confused on wether or not their services buildings has to be include in the current certification or could be certificated separately. Details:... Last reply: David Posada, Jan 23, 2017, 2:14 pm |
|
Proposed case cooling capacity reducing energy savingsNC-2009 EAc1: Optimize Energy Performanceposted by SSN Energy Model on Jan 19, 2017, 5:35 am
Hi, I am doing energy simulation for G+4 Labor Accommodation building. In base case, i have considered 2.66 COP. Auto sized as per ASHRAE. In proposed case, VRF System used with... Last reply: Marcus Sheffer, Jan 19, 2017, 9:11 am |
|
credits gained due to implementation hvac load reduction systemNC-2009 IEQc2: Increased Ventilationposted by sam Alfassy on Jul 4, 2016, 12:48 pm
I am looking to install hvac load reduction system (HLR ), the system functions by recycling the existing indoor AIR and removes... Last reply: Tristan Roberts, Jan 18, 2017, 12:20 am |
|
Building footprintNC-2009 SSc5.2: Site development - maximize open spaceposted by Febin Mohamed on Aug 9, 2016, 4:45 am
We are doing a campus approach for our project. For pursuing SSc 5.2, Case 2 "Open space that is equal to the building footprint can be Last reply: Tristan Roberts, Jan 17, 2017, 5:46 pm |
|
Mosquitos eradicate substanceNC-2009 SSp1: Construction Activity Pollution Preventionposted by Tota Yun on Oct 31, 2016, 3:23 am
How I can know if this substance which already used by the contractor in new construction project comply with LEED Last reply: Tota Yun, Jan 9, 2017, 12:11 am |
|
Inspection Reports- responsible partyNC-2009 SSp1: Construction Activity Pollution Preventionposted by komal kotwal on Sep 1, 2016, 11:28 am
Is it required that the on-site inspection be conducted by a third party or can a Contractor's representative conduct the same? Last reply: James Wilson, Jan 8, 2017, 12:22 pm |