Topic | Recent |
---|---|
Warehouse exhasut ventilationCS-v4.1 EQp1: Minimum indoor air quality performanceposted by Seungmin Kim on May 9, 2023, 7:55 pm
Hello, Last reply: Dave Hubka, May 30, 2023, 9:03 am |
|
Plastic Toilet CompartmentsNC-v4.1 EQc2: Low-emitting materialsposted by Cindy Quinn on May 26, 2023, 7:09 pm
Do plastic toilet compartments need to be included in the wall panels category? |
|
Heat Island Reduction- Non-roof measuresNC-v4.1 SSc5: Heat Island Reductionposted by Eslam Elshorbagy on May 24, 2023, 12:05 pm
Hello, To meet the credit, I want to ask if the mechanical and equipment rooms shouldn't be included (excluded) in the... Last reply: Samuel Calhoun, May 26, 2023, 3:51 pm |
|
Electrical Connectors in Waiting Area instead of Loading Dock DoorsWarehouses-NC-v4 LTc8: Green vehiclesposted by Armelle Le Bihan on Mar 1, 2022, 1:42 am
Hi, We are currently pursuing Option 2 for this credit and have a question conerning the location of sockets. In our DC project drivers usually wait in a waiting area rather than in their... Last reply: Cindy Quinn, May 26, 2023, 3:01 pm |
|
Thermal Comfort controlNC-v4 EQc5: Thermal comfortposted by Gail Napell on Sep 2, 2018, 2:56 am
has anyone achieved this credit through Comfy or a similar ap? Last reply: Greg Romanczyk, May 26, 2023, 11:36 am |
|
STC composite value for gşazed wallNC-v4.1 EQc9: Acoustic performanceposted by murat özdemir on May 26, 2023, 8:16 am
Hi fellow LEED experts, I am a acoustical consultant. I have a K12 project. I checked your apc table. I calculated the wall... |
|
What are the requirements for electrical outlets at the dock doorWarehouses-NC-v4 LTc8: Green vehiclesposted by Aleksandra Suchomska on May 26, 2023, 4:21 am
Hi, Has anyone achieved this credit for Reduced Truck Idling for non-hybrid trucks? How do I adjust the electrical outlets to connect the cab systems to power? Is there such a possibility... |
|
how can attachments (drawings, images) be sent in a CIR?NC-v4 IPc1: Integrative processposted by Sara BENLOUBA on May 25, 2023, 4:45 am
Dear Everybody, We would like to send a... Last reply: Marcus Sheffer, May 25, 2023, 5:47 pm |
|
Waste Stream Audit AFTER Performance Period?EBOM-v4 MRp1: Ongoing purchasing and waste policyposted by Heather Enos-Graves on Oct 17, 2022, 4:41 pm
Once the performance period closed for our project, we realized that we did not divert 75% of ongoing waste as required by the prerequisite. Can we perform the alternative waste stream audit now... Last reply: Randi B., May 25, 2023, 4:45 pm |
|
Pilot Credit 87- Verified Construction and Demolition RatesPilot-Credits MRpc87: Verified Construction & Demolition Recycling Ratesposted by Brightworks Sustainability on May 25, 2023, 3:03 pm
This credit was fairly easy to meet but I am wondering if all the C&D processing facilites we used must be verified? Last reply: Joseph Andracchio, May 25, 2023, 3:26 pm |