Non Regularly Occupied Spaces

Pilot-Credits EQpc116:Daylight in nonregularly occupied spaces
posted by  Divya Shroff  on 

I am trying to document the PILOT credit for a school project and am not sure if the restrooms fall under non regularly occupied spaces.v

3
Fri Oct 17, 2025, 3:35 pm

Integrative Analysis of Building Materials

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by  John Covello  on 

We have pursued this credit a few times now. It can be a heavy lift at first but once you get the documentation ready and forms completed it is easier on subsequent projects.

2
Mon Oct 13, 2025, 10:08 pm

Waste category as "construction & Demolition waste"

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Adam Insan  on 

One of project located in KSA following construction waste management credit targeting 2 points with 75% diversion as per option 2.

0

Multitenant Building

EBOM-v4 MPR2:Must use reasonable LEED boundaries
posted by  Sofia Barahona  on 

We are currently carrying out the feasibility study for the certification of an existing project in Operation and Maintenance v4.1: Existing Buildings.

3
President & Engineer
Gaia Blueprint
LEEDuser Premium Member
1 thumbs up
Mon Oct 13, 2025, 4:17 pm

Experiences with pursuing the Daylight in nonregularly occupied spaces pilot credit?

Pilot-Credits EQpc116:Daylight in nonregularly occupied spaces
posted by  Christopher Hoeh  on 

I'm somewhat surprised by the lack of posts for this topic.  We found it matched up nicely with our OPR and desire for appropriate daylighting throughout the project.  We actually fell ju

10
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Sat Oct 11, 2025, 12:31 am

Timeline to join for project team

Pilot-Credits IPpc90:Social equity within the operations and maintenance staff
posted by  Christoph Weindl  on 

We're pursuing "Social equity within the project team" with Option 2.

4
Wed Oct 8, 2025, 10:22 pm

Lighting Boundary if property boundary abuts parking spaces off of a public roadway?

NC-v4 SSc6:Light pollution reduction
posted by  Crista Shopis  on 

Hi, my project abuts a parking lot that is basically an expanded shoulder with spaces, directly off of a roadway.

3
Default Avatar
Senior Engineer, LEED AP
Taitem Engineering
LEEDuser Premium Member
6 thumbs up
Wed Oct 8, 2025, 7:27 pm

stronger feedback loop

Pilot-Credits EQpc114:Learning controls for thermal comfort
posted by  Brightworks Sustainability  on 

In implmenting this pilot credit on multiple projects now we have been very pleased with the strengthening of the feedback loop with occupants.

1
co-Founder
EMK Construction and Energy Co.
LEEDuser Premium Member
2 thumbs up
Tue Oct 7, 2025, 9:35 am

Treating open offices

NC-v4.1 EQc5:Thermal Comfort
posted by  Kai Starn  on 

Hi, I typically treat open offices as individual occupant spaces requiring controls (not multi-occupant) using the v4 credit. However, considering the v4.1 language removed "...

0

What happened to VOC content?

Mid-Rise-v4 EQc7:Low-emitting products
posted by  Michelle Rosenberger  on 

In the 2008 MFMR system, VOC content was under the material credit Environmentally Preferred Products. Now in v4 there is Low Emitting but it doesn't include VOC content just emissions.

0