Experiences with pursuing the Daylight in nonregularly occupied spaces pilot credit?
Pilot-Credits EQpc116:Daylight in nonregularly occupied spacesposted by Christopher Hoeh on
I'm somewhat surprised by the lack of posts for this topic. We found it matched up nicely with our OPR and desire for appropriate daylighting throughout the project. We actually fell ju
Timeline to join for project team
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Christoph Weindl on
We're pursuing "Social equity within the project team" with Option 2.
Lighting Boundary if property boundary abuts parking spaces off of a public roadway?
NC-v4 SSc6:Light pollution reductionposted by Crista Shopis on
Hi, my project abuts a parking lot that is basically an expanded shoulder with spaces, directly off of a roadway.
stronger feedback loop
Pilot-Credits EQpc114:Learning controls for thermal comfortposted by Brightworks Sustainability on
In implmenting this pilot credit on multiple projects now we have been very pleased with the strengthening of the feedback loop with occupants.
Treating open offices
NC-v4.1 EQc5:Thermal Comfortposted by Kai Starn on
Hi, I typically treat open offices as individual occupant spaces requiring controls (not multi-occupant) using the v4 credit. However, considering the v4.1 language removed "...
What happened to VOC content?
Mid-Rise-v4 EQc7:Low-emitting productsposted by Michelle Rosenberger on
In the 2008 MFMR system, VOC content was under the material credit Environmentally Preferred Products. Now in v4 there is Low Emitting but it doesn't include VOC content just emissions.
Modeling Process Hot water
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi, I am working on a test and reliability manufacturing facility, where we are using close to 65,000 gals of water for process load, what should be a good assumption to figure out how much of that
Pilot Credit LTpc134 - Advanced Transportation Monitoring Systems Pilot credits
CS-v4 INc1:Innovationposted by Adriana Hansen on
For the Advanced Transportation Monitoring Systems pilot credit, do we need to count only people tracked through access control (turnstiles), or also visitors who just stay in the lobby or
Office space only going for partial renovation.
CI-v4 MPR2:Must use reasonable LEED boundariesposted by shashank gangil on
Upload on LEED Online
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Catarina Costa Goncalves on
My understanding is that all documentation for WEpc115 must be uploaded in WE section and and not Innovation. Should the documentation be uploaded in Cooling Tower Water Use?