Topic | Recent |
---|---|
Clarification Needed on Reporting Bus TripsNC-v4.1 LTc5: Access to quality transitposted by on Sep 17, 2024, 1:12 pm
I’m seeking clarification on a matter related to daily trip reporting for our local transit system. We have multiple buses running simultaneously on certain routes. For instance, the local Route... Last reply: Andrey Kuznetsov, Sep 18, 2024, 2:50 am |
|
5 year replacement period?CI-v4 EAp3: Fundamental Refrigerant Managementposted by Laura Charlier on Sep 17, 2024, 2:03 pm
"For existing buildings with existing equipment or projects that use existing central plants, teams will need to check if CFC-based refrigerants are being used. If they are, LEED requires either... |
|
Integrative Analysis of Building MaterialsPilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by Chris Lombardo on Dec 3, 2021, 6:23 pmof LEED/Environmental Services Choate Construction Company LEEDuser Premium Member October 4, 2023- 5:07 pm EPDs/HPDs,SDS/MSDS all help address the requirements of this pilot credit. This forum has been so helpful... Last reply: Sayali Gudekar, Sep 16, 2024, 4:25 pm |
|
Pilot vs ACP?Pilot-Credits EApc95: Alternative Energy Performance Metricposted by on Sep 13, 2024, 5:26 pm
We have a project pursuing the EApc95 as part of its effort to monitor its carbon footprint. When registering the project for the pilot credit, we selected "ACP" (Alternative Compliance Pathway)... |
|
Maps from the Stone Age Don't Exist?NC-v4 SSc4: Rainwater managementposted by Hannah Fleck on Sep 12, 2024, 4:29 pm
I am trying to track down historical information to meet the compliance for the pre-development pathway but am coming up short for finding land cover and contour maps predevelopment. Is there a... Last reply: Andrey Kuznetsov, Sep 14, 2024, 5:59 am |
|
UL Greenguard GoldEBOM-v4.1 EQc1: Green Cleaningposted by Summer Minchew on Aug 30, 2024, 12:42 pm
Do products that have UL Greenguard Gold certification meet the requirements for Products & Materials? Last reply: Stephen Ashkin, Sep 13, 2024, 1:35 pm |
|
Energy modeling for Half a FloorCI-v4 EAp2: Minimum Energy Performanceposted by Edgar Arevalo on Sep 12, 2024, 2:14 pm
So we are facing a new Commercial Interior project that only takes up approximately half of a floor. The problem we are facing is if we can conduct an energy model for half of floor. The space... Last reply: Marcus Sheffer, Sep 12, 2024, 3:32 pm |
|
Pilot Comprehensive Composting sspc 129CI-v4 INc1: Innovationposted by Laurie Johnson on Aug 2, 2022, 8:15 pm
I am working on the the above Pilot credit using Option 1 Regular Compost Collection and Offste Processing. The client has chosen to work with the company CompostNow as there is no composting... Last reply: Mariia Savinska, Sep 10, 2024, 5:31 am |
|
Enhanced Commissioning- Envelope CommissioningNC-v4 EAc1: Enhanced Commissioningposted by Todd Bundren on Sep 6, 2024, 12:13 pm
I am working on a new Cancer Center in St. Louis, MO. We are pursuing the envelope... Last reply: Joyce Kelly, Sep 7, 2024, 2:42 pm |
|
LEED Documentation (MEPC) for Group ApproachNC-v4 EAp2: Minimum Energy Performanceposted by Apoorva Pradhan on Sep 4, 2024, 4:59 pm
Hello, I am working on a project with two buildings that are pursuing the LEED Group approach. I have combined the annual consumption and costs for both buildings for the energy... Last reply: Marcus Sheffer, Sep 5, 2024, 10:58 am |