Log in
Forum » Canada
Topic

How can a warehouse extension project (with no regularly occupied space) comply with EQp1?

Warehouses-NC-v4 EQp1: Minimum indoor air quality performance
posted by Blake Jackson on Dec 1, 2023, 2:33 pm

I'm working on a 455,000gsf expansion of an existing facility, which will have all new/standalone systems to support the new wing. The existing facility won't be impacted, spare for the...

Last reply: Dave Hubka, Dec 4, 2023, 9:26 am

LEED certification for open spaces

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Sergio Acevedo on Dec 1, 2023, 3:34 pm

We would like our expansion project to be LEED certified.

There will be no physical separation between the existing building and the extension (no walls).

In fact, the space will be...

Regularly used exterior entrances

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Julie Hardy on Nov 7, 2023, 11:20 am

Hello,

We have an office building where the main entrance is at the back, close to the parking area. All...

Last reply: Dave Hubka, Nov 7, 2023, 12:59 pm

CO2 monitoring for Core and Shell projects

CS-v4 EQc1: Enhanced indoor air quality strategies
posted by Irene Chung on Apr 9, 2017, 5:56 pm

Hi,

Is a copy of the lease agreement stating that tenants must install co2 sensors in all densely occupied spaces required for v4 Core and Shell projects?

If not, can the project...

Last reply: Laura Charlier, Nov 3, 2023, 2:57 pm

Contaminated material in a bulldozer demolition

NC-v4 MRp2: Construction and demolition waste management planning
posted by Priscillia Champagne on Jan 30, 2023, 3:12 pm

Hi LeedUser, 
We have a project to build a new school including a football field, 3 sports fields, a public plaza, a school bus drop-off and a parking lot. Project registered under LEED V4...

Last reply: Priscillia Champagne, Oct 30, 2023, 11:09 am

Interior Renovations to Historic Building while maintaining historic status

NC-v4 MRc1: Building life-cycle impact reduction
posted by Dimuth Kurukulaarachchi on Jan 25, 2018, 12:28 pm

Would a project still qualify for Option 1 Historic Building Reuse if it has a local historic designation (requiring maintenance of the building exterior components)?  The...

Last reply: Douglas Flandro, Oct 17, 2023, 8:36 am

Systems requiring metering

CS-v4 EAc3: Advanced Energy Metering
posted by Tim Nabholz on Apr 4, 2017, 11:20 am

Hi All,

I am pursuing this credit for a LEED v4 Core and Shell project and am having trouble determining which systems require meters. The credit requirements state "Install advanced...

Last reply: Tariq Muhammad, Oct 16, 2023, 1:49 pm

Anti-Ligature fixtures

NC-v4 WEp2: Indoor water use reduction
posted by Leanne Conrad on May 25, 2018, 12:59 pm

The reference guide is clear that special or unique water closets can be excluded from the credit calculations, my query is does this expand to special or unique fixtures? Our client requires...

Last reply: emily reese moody, Oct 5, 2023, 12:27 pm

Pursuing Whole Project Pilot in residential buildings

Pilot-Credits WEpc115: Whole Project Water Use Reduction
posted by Paul Erlichman on Oct 4, 2023, 10:44 am

Hello,
I posed a similar question in the forum for the Optimize Proces Water Use credit, but I figured I would post an addendum of sorts in the pilot credit forum.

My initial...

Low-flow WaterSense Devices

NC-v4 WEp2: Indoor water use reduction
posted by MAUDE PINTAL on Jun 15, 2020, 3:16 pm

Hello

Do you know models of bathroom faucets with a 0.5 gm flow that is WaterSense certified or certified aerators that can get the same flow?

Thank you,

Last reply: Aniket Singh, Sep 14, 2023, 4:57 pm