Log in
Forum » Sweden
Topic

LEED EBOM v4 minimum occupancy requirements

EBOM-v4 EAp2: Minimum Energy Performance
posted by on Jun 16, 2020, 10:22 am

Hello,

Does LEED EBOM v4 require a minimum occupancy requirement to be able to be certified?

Our building is fairly new and we are aware of the full 12 months energy use. The...

Last reply: Patrick Murisset, Jun 16, 2020, 2:59 pm

Smoking on roof

CS-v4 EQp2: Environmental tobacco smoke control
posted by Tobias Berge on Oct 11, 2017, 4:31 am

Do we need to prohibit smoking on the roof of a multi tenant office, hotell and retail building. The architect have designed an outdoor environment on the roof including vegetations, pounds, open...

Last reply: Bipin Karki, Apr 27, 2020, 5:15 pm

Alternative Energy Performance Metric for Swedish project

Pilot-Credits EApc95: Alternative Energy Performance Metric
posted by Pia Öhrling on Dec 13, 2018, 1:54 pm

We are trying to pursue this credit since it better reflects our building performance than the cost-metric and it also gives us more Points. We are having a bit of difficulty finding data for...

Last reply: Pia Öhrling, Apr 20, 2020, 8:55 am

WE Prerequisite 1

EBOM-v4 WEp1: Indoor water use reduction
posted by Alice Andersen on Mar 26, 2020, 11:26 am

I have a lavatory faucet that are automatically controlled (sensor control) and a flow rate of 5 l per minute. In accordance to the LEED manual the baseline is 1.9 l per minte.

When the...

Option 2- Leadership Extraction Practices

CS-v4 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Sara Johansson on Feb 27, 2017, 8:23 am

How can...

Last reply: Bipin Karki, Mar 12, 2020, 8:34 am

Use High Priority Site as Innovation

CS-v4 LTc3: High priority site
posted by Sara Johansson on Sep 29, 2017, 8:01 am

Hello, I have a CS v.2009 project and wish to use the High Priority v.4 credit as an innovation credit. Do I have to approach this in any special way, register or apply for using it, such as when...

Last reply: emily reese moody, Feb 5, 2020, 6:45 pm

Tenant Guidelines credit substitution to v4?

CS-2009 SSc9: Tenant Design and Construction Guidelines
posted by Maria Porter on Sep 20, 2017, 5:34 am

with multiple individuals or committees to gain the necessary approvals or changes. And I just want to remind LEED Canada users reading this discussion forum, that direction was provided for this issue in Credit...

Last reply: Allen Cornett, Jan 23, 2020, 11:10 am

Enhanced acoustical performance- project in Sweden

Pilot-Credits EQpc57: Enhanced acoustical performance - exterior noise control
posted by Sandra Holmström on Feb 18, 2019, 3:23 am

We are pursuing this pilot credit for one Swedish Project. We also think it is good to look at exterior noise pollution and that the requirements could be a bit stricter since we have more strict...

Last reply: Cathal Heneghan, Dec 6, 2019, 7:54 am

Exemplary Performance

CS-v4 EAc2: Optimize Energy Performance
posted by Maria Porter on Nov 29, 2019, 6:21 am

Is the Exemplary Performance threshold 54 % for CS as well (like NC?) The leap seems bigger for CS project than for NC Projects, based on that the table ends on 47 % for CS and 50 % for NC, both...

Last reply: Maria Porter, Dec 2, 2019, 9:21 am

Reduced Mercury in Lamps ID-credit

CS-2009 IDc1: Innovation in Design
posted by Maria Porter on Jan 16, 2018, 5:13 am

Hi!
I have prepared the ID-credit according to the text in...

Last reply: Edgar Arevalo, Aug 13, 2019, 11:41 am