Forum » Portugal
Topic

Process energy compliance

NC-v4 EAp2: Minimum Energy Performance
posted by Luis Andrade on Feb 25, 2019, 6:42 am

Helo al!

We are evaluating the LEED certification potential of a new winery that will be built in Portugal (using the rating system LEED BD+C v4: New Construction and Major Renovation)....

Last reply: Marcus Sheffer, Mar 4, 2019, 5:02 pm

LEED EB-OM- Office Building- Portugal- No Cooling Tower

Pilot-Credits WEpc94: No Cooling Tower
posted by Goreti Guedes on Feb 12, 2019, 12:26 pm

Dear all,

I have also some doubts about this Pilot Credit (No Cooling Tower):

Requirement:

''the baseline system designated for the building using ASHRAE 90.1-2010...

Energy Performance in Refrigerated Warehouses

NC-v4 EAp2: Minimum Energy Performance
posted by Luis Andrade on Feb 4, 2019, 10:35 am

One of our clients is considering the possibility of certifying a large Warehouse/Distribution Center under LEEDv4, which includes a significant portion of refrigerated spaces.

According...

Last reply: Marcus Sheffer, Feb 4, 2019, 11:39 am

Baseline monozone VAV

NC-v4 EAp2: Minimum Energy Performance
posted by Luis Andrade on Jan 29, 2019, 11:09 am

Hello,

I've a doubt regarding modeling a monozone baseline system (system 4).

Table G3.1.1B states that system 4 are constant volume. However, when I performe autosizing, some of...

Last reply: Marcus Sheffer, Jan 30, 2019, 11:56 am

Emergency fire ventilation fans (motors)- Section 10.4.1

NC-v4 EAp2: Minimum Energy Performance
posted by Luis Andrade on Jan 25, 2019, 7:50 am

Hi,

As per ASHRAE 90.1 - 2010, section 10.4.1, it is unclear for us if motors for fire surpression used in fans (manufactured after December 19, 2010) need to comply with the minimum...

Last reply: Marcus Sheffer, Jan 28, 2019, 9:36 am

Cross-contamination prevention: dedicated exhaust system still required?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Luis Andrade on Sep 21, 2018, 4:49 am

Hi,

In order to achieve EQc1 - option 1 do I still need to intall dedicated exhaust systems to all spaces where are hazardous gases are present? In LEED v2009  (IEQc5) this was mandatory....

Last reply: Stephanie Graham, Jan 9, 2019, 12:28 pm

Projects without exterior areas on the grounfloor

NC-v4 SSc3: Open space
posted by Ricardo Sá on Dec 11, 2018, 4:41 am

Dear All,

In case of projects without exterior areas on the grounfloor (LEED Boundary overlap the building footprint), can only balconies counts to achieve open space activation credit?...

Last reply: Tristan Roberts, Dec 11, 2018, 9:02 am

Strategies F and G

NC-v4 EQc6: Interior lighting
posted by Luis Andrade on Nov 15, 2018, 12:07 pm

Hello,

1) When persuing strategy G by measuring iluminance with a light meter after construction, is there any specific procedure that must be followed? For example, when measuring...

Last reply: Luis Andrade, Nov 21, 2018, 5:28 am

Land with agricultural use considered previously disturbed

NC-v4 SSc2: Site development - protect or restore habitat
posted by Ricardo Sá on Nov 13, 2018, 11:33 am

Dear All,

we are evaluating the LEED certification potential of a new building in Portugal (using the rating system LEED BD+C: New Construction and Major Renovation), located in a site...

Last reply: Paula Melton, Nov 20, 2018, 3:29 pm

Certifying a new airport terminal using LEED- exclude the runways?

NC-v4 SSc2: Site development - protect or restore habitat
posted by Ricardo Sá on Aug 6, 2018, 5:28 am

Dear All,

One of our clients is considering the possibility of certifying a new airport terminal using LEED and asked us to perform a preliminary evaluation of the potential LEED score....

Last reply: Konstantina Kalliakoudi, Nov 12, 2018, 8:42 am