OPTION 3. BROWNFIELD REMEDIATIONHospitality-NC-v4.1 LTc3: High Priority Site and Equitable Developmentposted by Francesco Lupoi on Apr 11, 2022, 7:18 am
Hi everyone, I'm working on a LEED Gold Certification of New Construction Hotel in Rome. Before the assignement by the building owner and before the start of works on the site construction... Last reply: Emily Purcell, Apr 22, 2022, 9:47 am |
|
ventilation in unheated and uncooled spacesNC-v4 EQp1: Minimum indoor air quality performanceposted by Francesco Passerini on Apr 21, 2022, 7:22 am
I have doubts relative to the correct intepretation of ASHRAE 62.1 for unheated and uncooled spaces. The text of ASHRAE is: 6.4 Natural Ventilation Procedure. Natural... |
|
Constant volume AHUs- Monitoring requirements AHU status On/OffNC-v4 EQp1: Minimum indoor air quality performanceposted by Alessandro Zuanon on Feb 23, 2022, 10:24 am
Dear all, i'm in the case of constant volume AHUs, the operating logic is ON/OFF. Regarding monitoring requirements for... Last reply: Alessandro Zuanon, Feb 28, 2022, 3:25 am |
|
Mandatory MERV 11 or higher filters in existing buildingNC-v4 EQp1: Minimum indoor air quality performanceposted by Francesco Passerini on Oct 15, 2021, 12:25 pm
The credit requests confirmation that the project has... Last reply: Afogreen Build, Feb 9, 2022, 9:39 am |
|
B.U.G. determinationNC-v4 SSc6: Light Pollution Reductionposted by Francesco Passerini on Jan 28, 2022, 12:43 pm
Hello, I remember a tool online for the determination of the BUG indexes. The upload of the photometric curves was necessary. I am no more able to find that. Is that no more available? Is there... Last reply: Francesco Passerini, Jan 29, 2022, 3:45 pm |
|
Possibility of unconditioned regularly occupied spaceNC-v4 EAp2: Minimum Energy Performanceposted by Alessandro Zuanon on Dec 16, 2021, 6:46 am
Hello, i'm in the case of a regularly occupied space (a mechanical workshop in a warehouse), in which there is the possibility of no heating or cooling system installation. Is it possible... Last reply: Afogreen Build, Dec 21, 2021, 6:01 pm |
|
Fine or bulky materialNC-v4 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Jun 10, 2021, 9:10 am
In order to specify the lighting power... Last reply: Dave Hubka, Dec 17, 2021, 3:50 pm |
|
Is it acceptable to use low-emission printers without providing doors for copy rooms?CS-v4 EQc1: Enhanced indoor air quality strategiesposted by Elisa Somma on Dec 2, 2021, 10:53 am
It’s about Option 1, Mechanically ventilated spaces, B. interior cross-contamination prevention. Can I attempt the credit option 1 using low-emission printers, certified Blue Angel (as... |
|
Parking not providedNC-v4 LTc7: Reduced parking footprintposted by Ana Milinkovic on Nov 30, 2021, 6:42 am
Hi everybody. I have just a simple question. If in my project parking is not provided, can I award this credit? At the same way, can I do the same with "SS Outdoor water use... Last reply: Bipin Karki, Dec 2, 2021, 9:37 am |
|
Project Registration FeeLEED Rating System Selectionposted by Luisa Scambia on Nov 30, 2021, 10:34 am
Hello LEEDusers, I was just told by a... |