Log in
Forum » Italy
Topic

Possibility of unconditioned regularly occupied space

NC-v4 EAp2: Minimum Energy Performance
posted by Alessandro Zuanon on Dec 16, 2021, 6:46 am

Hello,

i'm in the case of a regularly occupied space (a mechanical workshop in a warehouse), in which there is the possibility of no heating or cooling system installation. Is it possible...

Last reply: Afogreen Build, Dec 21, 2021, 6:01 pm

Fine or bulky material

NC-v4 EAp2: Minimum Energy Performance
posted by Francesco Passerini on Jun 10, 2021, 9:10 am

In order to specify the lighting power...

Last reply: Dave Hubka, Dec 17, 2021, 3:50 pm

Is it acceptable to use low-emission printers without providing doors for copy rooms?

CS-v4 EQc1: Enhanced indoor air quality strategies
posted by Elisa Somma on Dec 2, 2021, 10:53 am

It’s about Option 1, Mechanically ventilated spaces, B. interior cross-contamination prevention.

Can I attempt the credit option 1 using low-emission printers, certified Blue Angel (as...

Parking not provided

NC-v4 LTc7: Reduced parking footprint
posted by Ana Milinkovic on Nov 30, 2021, 6:42 am

Hi everybody.

I have just a simple question. If in my project parking is not provided, can I award this credit?

At the same way, can I do the same with "SS Outdoor water use...

Last reply: Bipin Karki, Dec 2, 2021, 9:37 am

Project Registration Fee

LEED Rating System Selection
posted by Luisa Scambia on Nov 30, 2021, 10:34 am

Hello LEEDusers, 

I was just told by a...

Certification Process

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Luisa Scambia on Nov 26, 2021, 9:38 am

Hello LEEDUsers,

Could you kindly confirm that my understanding of the LEED certification process/duration is correct:

  1. registration does not have an expiration date except the...

Rating System Selection

LEED Rating System Selection
posted by Gloria Rozzini on Nov 11, 2021, 10:28 am

Good morning everyone, 
in order to evaluate a project in which only strip-out works and renovation of the systems (electrical, mechanical, fire-fighting) are planned, without intervening...

"ready for review" status in Design Final Review Decision

CS-2009 IDc2: LEED Accredited Professional
posted by sofia la cognata on Nov 10, 2020, 6:17 am

Good Morning,

we have submitted this credit in the design review, but in the Design Final Review Decision the status is "ready for review" and not "anticipated" like the others. Can you...

Last reply: Gloria Rozzini, Oct 29, 2021, 11:00 am

Purchase green power contract for core and shell

CS-v4 EAc7: Green power and carbon offsets
posted by Vincenzo Giacalone Biondo on Oct 26, 2021, 6:04 am

Hello everyone,
I have a dilemma regarding a core and shell v4 project whose only energy source is electricity: the manual says that it is possible to calculate core energy consumption...

Last reply: Marcus Sheffer, Oct 26, 2021, 2:36 pm

piezometric tower as alternative water sources

CS-v4 WEc2: Indoor water use reduction
posted by Gloria Rozzini on Aug 5, 2021, 10:18 am

hello everyone. In one of our projects we have a piezomentric tower previously used as a process water. The water contained in this tower comes from the first water aquifer (therefore not potable...

Last reply: Michael Yi, Aug 5, 2021, 9:10 pm