Forum » Egypt
Topic

Shipping Room

NC-2009 IEQc6.2: Controllability of systems - thermal comfort
posted by Omar Elrawy on Mar 17, 2015, 11:44 am

Dear All,
We have a shipping room in our office NC building. The room has 11 lockers, each locker has a chair for 1 occupant. The 11 occupants of this room are supposed to stay...

Last reply: Lauren Sparandara, Jan 6, 2016, 1:48 pm

LEED EBOM Eligibility

EBOM-2009 PIf1: Minimum Program Requirements
posted by Amgad Khattab on Aug 25, 2015, 7:04 am

Tristan Roberts Representative-Elect Vermont House of Representatives LEEDuser Expert 11471 thumbs up December 30, 2015- 12:38 pm Ahmed, this is a question about where to put your LEED boundary. Please post to our MPR3 forum. Log in or register to post comments ...

Last reply: Tristan Roberts, Dec 30, 2015, 12:38 pm

Cnstrctn began with no LEED intent nw thy wnt rsume seeking LEED

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Aly Adel on Jan 6, 2015, 11:00 am

Hello!
We have a project that started construction some time ago, and stopped 1 yr ago, leaving only phase 1 (concrete slabs only). At this time, they were not considering LEED as an...

Last reply: Tristan Roberts, Nov 26, 2015, 10:46 pm

SRI Value for concerete

NC-2009 SSc7.2: Heat island effect - roof
posted by soha yamani on Aug 19, 2015, 7:15 am

Is there a standard...

Last reply: Tristan Roberts, Nov 26, 2015, 5:32 pm

Concerning Underground Basements

NC-2009 SSc6.1: Stormwater design - quantity control
posted by Omar Elrawy on Sep 17, 2015, 5:03 am

Dear all,
My project is two underground basement parking floors, that are built on the total land area, while the above-grade floors are built on 30% of the total land area....

Last reply: Michael DeVuono, Nov 11, 2015, 3:56 pm

LEED EBOM Eligibility

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Amgad Khattab on Aug 25, 2015, 7:11 am

We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED...

Last reply: Michael Opitz, Aug 25, 2015, 9:18 am

Deck to Deck Partition

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Omar Elrawy on Nov 5, 2014, 8:54 am

Dear all,
I have a gypsum board partitions with a false ceiling all over the floor. I need to know if I can use the Hard-lid ceiling as an alternative to the Deck to deck...

Last reply: Steve Loppnow, Feb 24, 2015, 4:59 pm

Polishing Powder

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Omar Elrawy on Jan 13, 2015, 7:27 am

Dear all,
I have a polishing powder that is intended to be used for polishing marble surface. Knowing that this powder is not expected to fill any gaps in the marble surface or...

Last reply: Jon Clifford, Jan 13, 2015, 9:06 pm

Separating Pantry Zone

NC-2009 EAp2: Minimum Energy Performance
posted by Omar Elrawy on Dec 3, 2014, 7:56 am

Dear all,
I have a case where I need to know if I should model separate Pantry zone in Both Basecase and Proposed Case, or in Basecase only?

I have an office building...

Last reply: Marcus Sheffer, Dec 3, 2014, 11:26 am

Hard-Lid Ceiling

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Omar Elrawy on Nov 5, 2014, 8:57 am

Dear all,
I need to know exactly what fulfills the "Hard-lid" ceiling?. I have a false ceiling with gypsum board partitions all over the floor; I need to know - for example -...

Last reply: Jon Clifford, Nov 11, 2014, 7:48 am