Log in
Forum » Asia – South and Southeast
Topic

Projects with several distinct structures

Hospitality-NC-v4 MPR3: Must comply with project size requirements
posted by Manzil Shrestha on Feb 13, 2024, 5:07 am

"Any single...

FEES FOR BASEMENT AREA

LEED v4.1 Discussion Forum
posted by Subrota Roy on Feb 6, 2024, 4:21 am

 Is it necessary to calculate the basement area when we calculate the...

Multilevel lighting control

NC-v4.1 EQc6: Interior lighting
posted by Michael on Jun 26, 2022, 11:55 pm

I have 10 lighting fixtures in an office space, and the architect is providing 3 on-off switches:

- switch 1, on-off 5 lightings (50% of lighting numbers)

- switch 2, on-off 2...

Last reply: Karen Joslin, Dec 18, 2023, 12:51 pm

Understanding Pilot-Credits IPpc101

Pilot-Credits IPpc101: Integrative process
posted by Fatimah Razak on Dec 16, 2023, 8:55 pm

Dear forum members,

I'm looking to gain a better understanding of Pilot-Credits IPpc101 and thought I'd reach out to this knowledgeable community. From what I've gathered, Pilot-Credits...

Change of space during performance period

EBOM-v4.1 EQp1: Minimum Indoor Air Quality
posted by Pulak Goyal on Dec 8, 2023, 3:12 am

I have a building going for LEED O+M v4.1 Existing Buildings Certification. 

Currently it has offices on one of the floors, but it is going to be changed into inactive storage space in the...

Measuring Chiller COP- LEED certification

CS-v4 EAp2: Minimum Energy Performance
posted by Shuvajit Batabyal on Jul 3, 2023, 7:09 am

Hello everyone.

The subject and the following question might be pretty basic, but since I have no prior experience with LEED certification I thought it would be best to hear what more...

Last reply: Marcus Sheffer, Nov 27, 2023, 11:45 am

What value should enter in Vdz in ventilation calculation.

CS-v4 EQp1: Minimum indoor air quality performance
posted by Prabhu Pe on Nov 24, 2023, 4:01 am

We are handling core and shell commercial project .the fresh air is supplied from the terrace inline fans and directly feed in to...

Bicycle credit doubts

NC-v4 LTc6: Bicycle facilities
posted by Deva venkat on Nov 4, 2023, 1:17 am

Hi team, i have doubts in bicycle credit.my project location is Bangladesh government using common road for two wheeler and four wheelers. Here how i get points in bicycle credit. 

R32 Refrigerant

NC-v4 EAc6: Enhanced Refrigerant Management
posted by Yodi Danusastro on Jan 24, 2018, 1:23 pm

Hi all. In the LEED form, the R32 refrigerant is not on the list. How to put it in form? Since its HFC refrigerant, the closest one is R410A, but R32 has better...

Last reply: Gustavo De las Heras Izquierdo, Nov 1, 2023, 12:17 pm

Big project site = more than 400m walking distance to nearest bus stop, but there is a shuttle service within the property.

NC-v4 LTc5: Access to quality transit
posted by Zirjay Villanueva on Apr 20, 2020, 3:33 am

We're working on a project with a big project site, and the nearest bus stop is more than 400m...

Last reply: Dave Hubka, Oct 31, 2023, 8:51 am