Log in
Forum » Asia – East
Topic

Minimum Energy Performance Review Phase

CS-v4 EAp2: Minimum Energy Performance
posted by Eric Kim on Feb 15, 2022, 1:41 am

Hello,
I have a question about the project review.
Our project was conducted by Spilt Review.

Currently, Design Final Review is in the Division stage.
In the Design Final...

Last reply: Eric Kim, Feb 15, 2022, 6:56 pm

ASHRAE 62.1 2010. Section 6.2.1.2 PM2.5

NC-v4 EQp1: Minimum indoor air quality performance
posted by Eric Dyer on Jan 11, 2022, 4:27 am

Hello
We are working on the LEED project in Korea.

I have a question about ASHRAE 62.1 2010.
Section 6.2.1.2 says, "When the building is located in an area where the national...

Last reply: Dang Thi, Jan 17, 2022, 3:10 am

Does the Core and Shell project also have to meet the Exhaust Rate for the Kitchen?

CS-v4 EQp1: Minimum indoor air quality performance
posted by Eric Dyer on Jan 9, 2022, 9:21 pm

Hello, I am working on a logistics warehouse project in Korea. The Rating System is v4 CS and I have a question in progress.

There is a Cafateria in our building, but due to the Core and...

A question about high-rise building material waste disposial

NC-v4 MRp1: Storage and Collection of Recyclables
posted by Jianzhushe Lili's on Sep 7, 2017, 12:41 am

Dear all:

Our project has company-wide recycling programs set up which collect...

Last reply: emily reese moody, Dec 21, 2021, 6:38 pm

Exhaust Ventilation make up air

CI-v4 EQp1: Minimum indoor air quality performance
posted by Eric Dyer on Dec 2, 2021, 9:18 pm

Hello, we are dealing with the interior project of a beauty shop.

Some of the space in the project is ventilated with an Energy Recovery Unit and an Exhaust Fan.

ERU did not meet...

Confusing about how to determine the Vps in VRP calculation

CS-v4 EQp1: Minimum indoor air quality performance
posted by James Cai on Oct 26, 2021, 10:01 pm

Dear all,

We have been told by LEED coach that under cooling condition, the VRP calculation should use minimum Vpz for zone, and use the design maximum Vps for system, but if all VAVbox's...

Confusing about how to determine the Vps in VRP calculation

NC-v4 EQp1: Minimum indoor air quality performance
posted by James Cai on Oct 24, 2021, 11:59 pm

Dear all,

We have been told by LEED coach that under cooling condition, the VRP calculation should use minimum Vpz for zone, and use the design maximum Vps for system, but if all VAVbox's...

which ratign system can choose for Colleges and Universitie?

LEED Rating System Selection
posted by abduxukur zayit on Jul 23, 2021, 2:36 am

hi,

i am from China, and

1) wonder which ratign system is applicable for ASSESSMENT of Colleges and Universities ?

2) is the rating system can be used asssess WHOLE CAMPUS of...

Last reply: Afogreen Build, Sep 13, 2021, 3:26 am

Pellets data input, arc

Discuss the LEED Dynamic Plaque and Arc
posted by Matthew Bailey on Sep 9, 2021, 8:05 pm

This is a question regarding data input in the arc.
Hello, I am currently working on an old city office renovation project which will be converted into a public bath facility in Nanto-city...

How to face nova mutation virus by using Re-Enter Your Workspace method?

Pilot-Credits INpc136: Safety First: Re-Enter Your Workspace
posted by yingling guan on Sep 5, 2021, 11:34 pm

ReOccupancy_Assessment_Tool is a good guide for the proverty management of public areas, but it is difficult to implement the internal management of small tenants.  Is there a convenient tool to...