Topic | Recent |
---|---|
Interiors Life-Cycle Impact Reduction- Option 3 Design for FlexibilityCI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Laura Riegle on Jul 13, 2022, 9:26 am
Hi, I am persuing the "Interiors Life-Cycle Impact Reduction" credit, Option 3: Design for Flexibility for a CI project. In the project, there are concrete floors (no systems to... |
|
LEED OM V4.1 Location problemEBOM-v4.1 LTp1: Transportation Performanceposted by Saba Hajizadeh on Jun 21, 2022, 6:14 am
Hello everyone, I'm working on a project, the location of this building is Iran, but I couldn't find it on the ARC website. Do you have any suggestions? What should I do? ... |
|
Compliance of Lighting fixturesNC-v4.1 EQc6: Interior lightingposted by Ellis John Mandia on May 23, 2022, 1:52 am
Hello all, Here is a actual problem I have encountered. What will happen if the lighting consultant has provided the necessary documents that comply with all the requirements for the... |
|
Different Baseline HVAC SystemNC-v4 EAp2: Minimum Energy Performanceposted by Amal Venugopal on May 17, 2022, 4:50 am
Greetings!.. We have begun the energy modeling for factory building. In addition to the factory, the building houses a warehouse and an administration office. The building has 2,00,000... Last reply: Marcus Sheffer, May 17, 2022, 9:31 am |
|
District cooling chilled waterCS-v4 WEc2: Indoor water use reductionposted by Dina El-Sady on Apr 27, 2022, 6:42 am
If the project is served by a district cooling plant outside LEED project boundary , does the chilled water count as process water and needs to be included in water efficiency calculations? Last reply: emily reese moody, May 13, 2022, 7:32 pm |
|
Hospitality RatingLEED Rating System Selectionposted by RIMA BOUDABA on Apr 29, 2022, 2:14 am
Hi I have one resort (43000 sqm) in Riyadh- Saudi Arabia, one palace with 81% refusrbishment and 10 new villas around the palace. I would like to confirm first if the BD+C... |
|
Uplights in an LZ0 zoneNC-v4.1 SSc6: Light Pollution Reductionposted by Ellis John Mandia on Apr 11, 2022, 8:36 am
Can the percentage values prescribed in the "Maximum allowed percentage of total luminaire lumens emitted above horizontal" be taken as time-related? For example, if we have uplights in a LZ0... Last reply: Bill Swanson, Apr 21, 2022, 9:13 am |
|
LEED Campus V4 MatrixLEED Guidance for Campuses and Multiple Buildingsposted by sana salman on Apr 18, 2022, 7:05 am
Hello , Does anyone have LEED v4 campus matric for BD+C. I downloaded LEED guidance for Campus but it has credits and Matrix for LEED 2009. also can i register the campus with... Last reply: Erin Holdenried, Apr 18, 2022, 9:55 am |
|
Option 2:Only CO2 sensorsCS-v4 EQc1: Enhanced indoor air quality strategiesposted by Dina El-Sady on Apr 11, 2022, 6:48 am
The project is totally mechanically ventilated .I am choosing adding CO2 sensors in dense areas for option 2 for additional... Last reply: Michelle Rosenberger, Apr 13, 2022, 10:12 am |
|
Fire alarm cables (Public Address system) in the hospitalsHealthcare-v4 MRc6: PBT source reduction - lead, cadmium and copperposted by Najam Us Saqib on Apr 7, 2022, 2:54 am
Fire alarm cables are same like electrical cables, however, its function is different. The v4 LEED guide uses the words ''Electrical wiring and cabling'' under Lead requirements (... |