Topic | Recent |
---|---|
Calculator tableNC-v4 SSc4: Rainwater managementposted by Gracielli Monteiro on May 2, 2019, 10:02 am
we used combined... |
|
Grass only landscapingCS-v4 WEc1: Outdoor water use reductionposted by Marina Andrade on Apr 26, 2019, 10:49 am
Hello, My team is currently working on a project and we are not sure we meet the criteria for option 1 (no irrigation required) in both WEp1 and WEc1 - Outdoor Water Use Reduction. ... |
|
Renewable energy certificateNC-v4 EAc7: Green power and carbon offsetsposted by CT G on Apr 17, 2018, 6:38 pm
I'm working on a project located in Brazil. The client already buys energy from a company with Renawable energy certification, which is appliable for this credit according to LEED ACP for... Last reply: Olga Yuil, Mar 19, 2019, 6:06 pm |
|
CIBSE AM10 Flow Chart (Figure 2.8)NC-v4 EQp1: Minimum indoor air quality performanceposted by Vitor Tosetto on Jun 26, 2015, 3:14 pm
Dears, I'm developing a small project LEED v4. We don't want to use HVAC system, just natural ventilation. But I am with big difficults to understand how I can provide a documantion... Last reply: Dionisio Franca, Oct 29, 2018, 8:40 pm |
|
EKOenergy labeled I-RECsRetail-CI-v4 EAc6: Green power and carbon offsetsposted by Raissa Petri on Aug 29, 2018, 10:38 am
Hello, May I use EKOenergy instead of I-RECs for this credit? Or EKOenergy labeled I-RECs instead of "... Last reply: Marcus Sheffer, Sep 7, 2018, 12:07 pm |
|
Energy Star EquivalentRetail-CI-v4 EAp2: Minimum Energy Performanceposted by Luiza Junqueira on Aug 23, 2018, 3:24 pm
Hello, How do I find out if my local energy label (Selo Procel) is equivalent to energy star? I Know that in v.3 LEED used to accept our label, but I don't know if its the same for... Last reply: Marcus Sheffer, Aug 24, 2018, 1:44 pm |
|
Regular Building OccupantDiscuss the LEED Dynamic Plaque and Arcposted by Luiza Junqueira on Aug 23, 2018, 8:30 pm
How do I find out the regular building occupant on a multi tenant building for ARC? |
|
renewing the certificationRetail-CI-v4 EAc6: Green power and carbon offsetsposted by Raissa Petri on Aug 3, 2018, 6:39 pm
Regarding the following: "Engage in a contract for qualified resources that have come online since January 1, 2005, for a minimum of five years, to be delivered at least annually. The... Last reply: Marcus Sheffer, Aug 6, 2018, 9:18 am |
|
Option 3. design for flexibility- Acessible ceiling systemCI-v4 MRc2: Interiors life-cycle impact reductionposted by Lara Branco on Jul 10, 2018, 9:05 pm
The project I'm working on will leave all the ceiling infrastructure apparent, without the use of ceiling tiles (except a few acoustic panels). Therefore all the lighting, plumbing, etc. that are... |
|
Construction PhasesHospitality-NC-v4 MPR1: Must be in a permanent location on existing landposted by Larissa Murakami on Jun 27, 2018, 11:21 am
We have a project to be registered in LEED NC for hotels. The project consists of several towers and some units of chalets. Each group of towers will be executed in distinct phases, will be 3... Last reply: emily reese moody, Jun 28, 2018, 9:24 pm |