Topic | Recent |
---|---|
Tenant Work: Tenant Sales or Tenant Neutral?CS-v4 WEp2: Indoor water use reductionposted by Victoria Rios Esteve on May 31, 2019, 3:03 pm
Hi everyone! Im quite new at LEED so I would really appreciate your help. Im working with the Water Efficency Credit 3: Water use reduction form. So, there are two first options: In scope or... Last reply: emily reese moody, Jan 31, 2020, 8:17 pm |
|
Owner´s representative: requirements? can be changed?Navigating LEED Onlineposted by Victoria Rios Esteve on Jan 23, 2020, 3:21 pm
Hi everyone! My team and I are wondering if there are any requirements when selecting the owner´s representative within LEED Online. Will this person have access to LEED Online? And... |
|
Existing building major renovationNC-v4 LTc2: Sensitive land protectionposted by Victoria Rios Esteve on Jan 16, 2020, 9:59 am
Hi everyone! I have the following doubt. We are about to start the certification as NC Major Renovation of an exisiting building. It is a Zero Lot Line project. Can this type of project be... Last reply: Blake Jackson, Jan 16, 2020, 11:31 am |
|
Still able to have commingled waste being recycle?NC-v4 MRp2: Construction and demolition waste management planningposted by Victoria Rios Esteve on Dec 30, 2019, 3:58 pm
Hi everyone! Im starting a new project that will certify as NC Major Renovation in LEED v4. So, we were analysing this credit´s option 1 (either path 1 or 2). Due to our location, we are... Last reply: Allen Cornett, Jan 14, 2020, 2:45 pm |
|
"Open to update" an already awarded creditCS-2009 WEp1: Water Use Reductionposted by Victoria Rios Esteve on Jan 14, 2020, 1:34 pm
Hi everyone! We have recently received the design final review and are preparing the construction submittal for a v2009 Core and Shell project. On the design final review, WEp1 has been... |
|
Installed and not Installed HVACCS-2009 EAp2: Minimum Energy Performanceposted by Paula Hernandez on Jan 3, 2020, 9:50 am
Hi, I am modeling a C&S building for the Construction Submittal, and I have to adjust the Design Submittal Energy Model because the Owner change the brand of the VRF systems. ... Last reply: Paula Hernandez, Jan 8, 2020, 6:10 am |
|
Project Zero Lot Line with Major RenovationNC-v4 SSp1: Construction Activity Pollution Preventionposted by Victoria Rios Esteve on Dec 30, 2019, 4:05 pmVanessa Nelson LEEDuser Expert 7 thumbs up January 6, 2020- 8:32 pm An ESC plan is still required for zero lot line projects. There is helpful information including example strategies for zero lot line projects in the LEED v3 forum at the link below. All requirements for this credit are the same except that LEED v4 requires the ESC plan comply with the 2012 EPA CGP rather than the 2003 version required by v3. https://leeduser.buildinggreen.com/credit/NC-2009/SSp1#bev-tab Log in or register to post comments ... Last reply: Vanessa Nelson, Jan 6, 2020, 8:32 pm |
|
Area for collection of recyclables on Campus certificationCS-2009 MRp1: Storage and Collection of Recyclablesposted by Victoria Rios Esteve on Dec 23, 2019, 2:42 pm
Hi everyone, We are close to certify a Core and Shell project as Campus. We have the following doubt: is it necessary to have an specific area for storing and collecting recyclables for... |
|
Available regional credits for Buenos Aires?NC-v4 RPc1: Regional Priorityposted by Victoria Rios Esteve on Nov 21, 2019, 9:29 am
Hi everyone, I was wondering if anyone has idea which regional credits are available for Buenos Aires, Argentina right now. Thank you for your answer! Last reply: Tristan Roberts, Dec 1, 2019, 6:04 pm |
|
Available regional credits for Buenos Aires?NC-2009 RPc1: Regional Priorityposted by Victoria Rios Esteve on Nov 21, 2019, 9:30 am
Hi everyone, I was wondering if anyone has idea which regional credits are available for Buenos Aires, Argentina right now. Thank you for your answer! Last reply: Tristan Roberts, Nov 26, 2019, 1:19 pm |