INpc136- Daily Journal Further Specifications

Pilot-Credits INpc136: Safety First: Re-Enter Your Workspace
posted by Frida Villa on Sep 22, 2021, 3:36 pm

Is there a requirement/recomendation on how long the daily survey needs to be applied for? The requirements under the credit are not very specific when it comes to the daily journal, what do you...

Last reply: Vladimir Mota, Oct 13, 2021, 9:22 pm

INPc136: Safety First- Re-Enter your Workspace

CS-2009 IDc1: Innovation in Design
posted by Juan Guerrero on Oct 11, 2021, 2:08 pm

Hi everyone,

We have a dout about the photos we need to take for this credit.

Can we just take pictures of the signals for the covid rstrictions? Or do we need to thake...

Option 1. LEED Energy Budget

Homes-v4 EAc1: Annual energy use
posted by Gustavo De las Heras Izquierdo on Jan 31, 2018, 3:18 pm

Hallo,

The credit requirements state the following: "Projects with major energy users not included in the ...

Last reply: Brightworks Sustainability, Oct 8, 2021, 7:01 pm

IDc1.5 Water Restoration Certificates

CS-2009 IDc1: Innovation in Design
posted by Juan Guerrero on Sep 23, 2021, 11:22 am

Hi everyone, after the credit is done and the construction starts to run, how I can verificate the real numbers with the one who were obtained of the calculator?

IDc1.4 Bird Collision Deterrence

CS-2009 IDc1: Innovation in Design
posted by Juan Guerrero on Sep 22, 2021, 12:14 pm

Which is the purpose to count the area from the metal walls for this credit? does the birds also have metal wall collisions?

INPc136_Daily Journals

CS-2009 IDc1: Innovation in Design
posted by Juan Guerrero on Sep 15, 2021, 12:05 pm

Hi everyone, I have a question from the credit Safet First: Re-Enter Your Workspace.

For the Daily Journal Management and Daily Journal Occupants documents, do we need to fill the sheets...

Electric Charging Stations out of Leed Boundary

NC-v4 LTc8: Green vehicles
posted by Jorge Lopez de Obeso on Sep 3, 2021, 3:15 pm

Hi !

Leed v4:

Is it possible to have electric charging station out of the Leed Boundary ?  This secundary parking lot, where the charging stations are, provides service to the whole...

Last reply: Afogreen Build, Sep 13, 2021, 2:58 am

MERV 11

NC-v4 EQp1: Minimum indoor air quality performance
posted by Gustavo De las Heras Izquierdo on May 17, 2017, 12:48 pm

Hallo,

In an office building located in Mexico City (a location with a high PM2.5 and ozone levels), the floors are served by AHU’s equipped with...

Last reply: Olman Joaquin Ledezma Unzueta, May 11, 2021, 10:54 am

Strategies

Pilot-Credits SSpc55: Bird collision deterrence
posted by Carolina Vasquez on Jun 4, 2020, 1:00 pm

Hi, 

We have implemented additional strategies at our office with regards to the bird collision detterrence monitoring program but we have registered a couple of bird strikes. I would like...

Last reply: Michelle Cordero, Apr 28, 2021, 12:43 pm

Enclosed Parking Garage Ventilation

CS-2009 EAp2: Minimum Energy Performance
posted by Gabriela Mena on Oct 27, 2020, 10:33 am

Hi, 

We are working on a CS V2009 project that is willing to control the parking garage ventilation by detecting contamination levels. According to ASHRAE 90.1-2010, the airflow...

Last reply: Tyler Thumma, Nov 6, 2020, 9:14 am