Topic

Laboratory 90.1 Modeling

NC-2009 EAc1: Optimize Energy Performance
posted by Victoria Watson on Dec 4, 2014, 11:23 am

Hi,
I am modeling a laboratory which has a small area of office space for LEED and wanted to check a couple of approaches:
1) The engineers have informed me that the lab has to be a...

Last reply: Marcus Sheffer, Mar 4, 2015, 2:52 pm

G3.1.10 (d) "Heating only System"

NC-2009 EAp2: Minimum Energy Performance
posted by Anil Bhari on Feb 27, 2015, 9:37 am

Based upon G3.1.10 (d) “Where no cooling system exists or no cooling system has been specified, the cooling system shall be identical to the system modeled in the baseline building”

Does...

Last reply: Marcus Sheffer, Feb 27, 2015, 4:51 pm

Option 3: Determining HC and NOx emissions

EBOM-v4 SSc5: Site management
posted by Michelle Raigosa on Feb 27, 2015, 10:34 am

Although an Equipment Emissions Reduction Calculator is provided, how do we address maintenance vehicles used on site? The calculator only accounts for equipment but wouldn't a pressure washer...

Last reply: Michelle Raigosa, Feb 27, 2015, 11:30 am

Final M&V Report

NC-2009 EAc5: Measurement and Verification
posted by Valerie Walsh on Feb 26, 2015, 12:58 pm

We would like to know if the project can obtain its LEED certification prior to submitting the Final M&V Report, which is dependent upon 1 year of post-occupancy energy use data. Can anyone...

Last reply: Valerie Walsh, Feb 26, 2015, 3:11 pm

Unrenovated gross square footage

NC-2009 PIf2: Project Summary Details
posted by Joseph Greene on Feb 25, 2015, 4:21 pm

Our project is an addition to an existing building. Would the existing building square footage (not part of our LEED application other than being within our LEED boundary) be included in...

Last reply: Joseph Greene, Feb 26, 2015, 8:19 am

Parking Area Clarification

General forums
posted by Kristy O'Hagan on Feb 25, 2015, 10:29 am

In the latest Update to...

WEp1- PIf3 link- new LEED on line

NC-2009 WEp1: Water Use Reduction
posted by Todd Bundren on Feb 24, 2015, 10:51 am

My project was upgraded to the new version of LEED online around the beginning of the year so I am getting used to the new set up (so far it is very nice). Question: My plumbing engineer has said...

Last reply: Kathryn West, Feb 24, 2015, 10:59 am

Baseline Return/Relief Fan Power

NC-2009 EAp2: Minimum Energy Performance
posted by Haojie Wang on Feb 23, 2015, 2:05 pm

90.1 AppG G3.1.2.8 says the return/relief fan should be sized for max (SA-OA, 90%*SA) [cfm]. But in table 1.4. the allowable fan power is only based on the supply fan power. If I calculate the...

Last reply: Marcus Sheffer, Feb 24, 2015, 10:20 am

LEED Certified C&D sites

NC-2009 MRc2: Construction Waste Management
posted by Frances Stark on Feb 19, 2015, 9:25 pm

February 23, 2015- 4:54 pm Frances- If Kristina is correct in what you are seeking, you might want to post a question on that Pilot Credit's forum- http://www.leeduser.com/credit/Homes-v2008/MRpc8....

Last reply: RETIRED, Feb 23, 2015, 4:54 pm

Exam room sinks

NC-2009 WEp1: Water Use Reduction
posted by Laura Charlier on Feb 20, 2015, 4:20 pm

Do sinks in exam rooms need to be included in the calculations? They are primarily used for handwashing. If so, are they entered as 'sinks' or 'lavatories' as the baseline?

Thanks.

Last reply: Michelle Robinson Schwarting, Feb 20, 2015, 5:58 pm