Pressure drop adjustment factor with DOAS SystemCS-2009 EAc1: Optimize Energy Performanceposted by Curtis Clark on Apr 8, 2015, 4:21 pm
In the proposed model, we have a HEPA 13 filter in a dedicated outdoor air unit which serves a variable refrigerant flow system. In the baseline model, we have... Last reply: Marcus Sheffer, Apr 9, 2015, 10:51 am |
|
Furniture CostCI-2009 MRc5: Regional Materialsposted by Morteza Kasmaei on Apr 3, 2015, 4:39 pm
In a LEED-CI project, can we attempt for MRc4, MRc5, and MRc7 but not included cost of furniture in the calculator? It means that the furniture is not included in any of the LEED-CI credits.... Last reply: Morteza Kasmaei, Apr 7, 2015, 7:19 pm |
|
Energy Star minimum area = 5,000sfEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Saul Pichardo, AIA on Apr 6, 2015, 9:32 pm
I would like to certify a two story, 3,800 s.f. office building. When generating the Energy Star performance report one question asks to confirm that the building area is 5,000 s.f. or greater... Last reply: Ben Stanley, Apr 7, 2015, 11:59 am |
|
Sample LEED 2009 Basis of Design DocumentNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Robert Shields on Apr 7, 2015, 11:34 am
I have a sample Basis of Design document that applies to LEED 2.2. Not sure if there are any differences in the requirements for the document required in LEED 2009. Would appreciate sample... Last reply: Scott Bowman, Apr 7, 2015, 11:46 am |
|
Enhanced IAQ Strategies- Hazardous Gases/ChemicalsNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Mark Zoeteman on Apr 2, 2015, 5:06 pm
Option 1, Enhanced... Last reply: Susan Walter, Apr 3, 2015, 5:10 pm |
|
Regularly Occupied or Not?NC-2009 IEQc8.1: Daylight and views - daylightposted by Cynthia Estrada on Apr 2, 2015, 4:28 pm
Hello- Last reply: TODD REED, Apr 3, 2015, 8:21 am |
|
Existing Biofuel Station on CampusNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by GTF CPRE on Apr 2, 2015, 1:52 pm
Our project is on a university campus that has an existing biofuel station for fleet vehicles. The biofuel station services the entire campus and is not located with our LEED boundary for this... Last reply: Helen Kessler, Apr 2, 2015, 2:03 pm |
|
Minimum Energy Performance Calculator- Receptacle EquipmentNC-v4 EAp2: Minimum Energy Performanceposted by Mark Zoeteman on Apr 1, 2015, 3:22 pm
Minimum Energy Performance Calculator on process loads tab under receptacle equipment modeling methods paragraph indicates there are three options to model receptacle equipment: average equipment... Last reply: Marcus Sheffer, Apr 1, 2015, 7:40 pm |
|
Car DealershipNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Robert Shields on Apr 1, 2015, 3:41 pm
We are working on a project to build a Toyota Dealership in Pennsylvania and the owner is seeking LEED Certification (LEED 2009). The dilemma is this; for counting parking spaces do we include... Last reply: Michelle Rosenberger, Apr 1, 2015, 4:32 pm |
|
Prevention Through Design- LEED PilotGeneral forumsposted by Denise Bender on Mar 18, 2015, 5:41 pm
We have a design review tool for new and existing construction projects that incorporates a decisional aid for identifying Environment, Health, Safety and sustainabiliy issues and what measures... Last reply: Tristan Roberts, Apr 1, 2015, 8:09 am |