Percentage of Light Output/Wattage DimmedCI-2009 EAc1.2: Optimize energy performance - lighting controlsposted by Jordan Kirrane on Mar 22, 2016, 2:04 pmLEEDuser Expert 5796 thumbs up March 23, 2016- 11:23 am I answer questions here because it is in a public forum benefiting many. Sending me drawings crosses the line into my fee for service consulting... Last reply: Marcus Sheffer, Mar 23, 2016, 11:23 am |
|
Determination of 2 year energy consumptionNC-2009 EAc6: Green Powerposted by Jordan Kirrane on Mar 21, 2016, 5:46 am
Hi there, My project wishes to calculate the GWh of... Last reply: Jean Marais, Mar 21, 2016, 12:51 pm |
|
Retail RefrigerationRetail-NC-v4 EAp4: Fundamental Refrigerant Managementposted by Jason Smith on Feb 15, 2016, 11:02 am
I am currently working on a new retail construction project and would like to know if we should include the chilled drink cabinets (fizzy drinks, Milk etc.) within the Fundamental Refrigeration... Last reply: Melissa Kelly, Mar 3, 2016, 3:48 pm |
|
Cycle network, paths?NC-v4 LTc6: Bicycle facilitiesposted by Karen Elliott on Feb 19, 2016, 11:15 am
Does anyone know if paths used for pedestrians and cyclist count as 'off Street'... Last reply: Kimberly Schlaepfer, Feb 25, 2016, 6:37 pm |
|
Perimeter protectionNC-2009 SSp1: Construction Activity Pollution Preventionposted by Martin Meehan on Feb 11, 2016, 9:33 am
We have a number of LEED projects in infill locations in Ireland. Since we don't really have a standard code for site Erosion and Sedimentation we have to stick to the U.S. EPA's... Last reply: Michael DeVuono, Feb 11, 2016, 1:22 pm |
|
Contaminated soil found during excavation.CS-2009 SSc3: Brownfield Redevelopmentposted by Martin Meehan on Feb 8, 2016, 6:40 am
The project involved the demolition of a existing building that had asbestos present on it. Asbestos were removed prior to demolition and the process was properly documented for LEED. ... Last reply: Larry Sims, Feb 8, 2016, 12:28 pm |
|
FTE for campus or for buildingNC-2009 WEp1: Water Use Reductionposted by Karen Elliott on Jan 27, 2016, 10:35 am
We have a manufacturing campus and are assessing a new office block within that campus. Within this block there are large toilet and shower facilities that will be used by everyone on the entire... Last reply: Melissa Merryweather, Jan 29, 2016, 9:34 pm |
|
FTE for campus or for buildingNC-2009 WEp1: Water Use Reductionposted by Karen Elliott on Jan 27, 2016, 10:49 am
We have a manufacturing campus and are assessing a new office block within that campus. Within this block there are large toilet and shower facilities that will be used by everyone on the entire... |
|
Top level parking_Option 1NC-v4 SSc5: Heat Island Reductionposted by Rasita Masalskyte on Jan 26, 2016, 6:54 am
Hello, We're pursuing Option 1. Nonroof and roof. Last reply: Ashwini Arun, Jan 27, 2016, 10:38 am |
|
FTE for campus or for buildingNC-2009 WEp1: Water Use Reductionposted by Karen Elliott on Jan 27, 2016, 10:22 am
We have a manufacturing campus and are assessing a new office block within that campus. Within this block there are large toilet and shower facilities that will be used by everyone on the entire... |