Privicity for RestroomsPilot-Credits EQpc117: Quality views in nonregularly occupied spacesposted by Alicia Carrillo on Sep 30, 2022, 4:13 pm
Is it possible to consider obstruction such as louvers on Restrooms to mantain privacity while having quality views? |
|
Trend of water meter and leak sensor in Japan projectsPilot-Credits WEpc153: Water Leak Detection and Monitoringposted by Yohei Ohashi on Oct 7, 2022, 2:52 am
I am seeking to achieve Pilot-Credits WEpc153 - Water Leak Detection and Monitoring for LEED ID+C. The Project in Japan generally is required to install a tenant level water meter and... |
|
LEED O+M v4 Pilot Credit ParticipationPilot-Credits IPpc101: Integrative processposted by Kelvin Chan on Oct 23, 2022, 11:53 pm
As per the requirements of the pilot credit, we are noting our participation in this forum. Our project is located in Hong Kong. I sugguested to sep up an IP team inclueds owner,... |
|
Tree height and grade elevation data for future consideration?Pilot-Credits SSpc158: Onsite Carbon Sequestration Through Plantingsposted by Yuki Suda on Oct 27, 2022, 1:19 am
Hi there, it appears that some of the carbon sequestration calculations out there considers tree heights and volume as part of the analysis, which was not asked when inputting data via i-Tree... |
|
Cooling Towers to meet the loads of uninterrupted office systemsPilot-Credits WEpc94: No Cooling Towerposted by Adriana Hansen on Nov 4, 2022, 7:53 pm
Could projects with HVAC system base conception composed by direct expansion air cooled VRF system for all spaces, but including a condensing water plant to provide a condensate water point to... |
|
Local food production closed for registrationPilot-Credits SSpc82: Local food productionposted by Adriana Hansen on Nov 6, 2022, 3:17 pm
Hi! Just updating: The Pilot credit SSpc82 Local food production was closed for registration on 8/12/2022. However, a similar credit is available for use through the ... |
|
Monitoring PlanPilot-Credits SSpc55: Bird collision deterrenceposted by Aliesa Adelman on Nov 8, 2022, 2:47 pm
Wondering if there has been any reviewer feedback others can share on their 3 year monitoring plan and criteria outside of the examples provided? |
|
Comments following the first attempt to document this Pilot CreditPilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environmentposted by Megan Leslie on Nov 9, 2022, 3:48 pm
These were the comments our project's Interior Designer wished to share: Although this credit was quite easy to document and achieve, as the LEED design categories and criteria are... |
|
Change in pilot credit requirementsPilot-Credits WEpc147: All-Gender Restroomsposted by Megan Leslie on Nov 9, 2022, 4:36 pm
One thing our team noticed was that the pilot credit requirements have changed over time. Originally the requirement said "Facilities SHOULD provide means for the distribution of menstruation... |
|
No Cooling Tower SwedenPilot-Credits WEpc94: No Cooling Towerposted by Louise Holmstedt on Nov 10, 2022, 6:55 am
We are pursuing this pilot credit as ACP for a Swedish Project. We Think it is fair that Projects without cooling Towers can achieve the no cooling Tower credit too. |