Log in
Forum
Topic

Minimum Energy Performance Calculato

Pilot-Credits EApc143: Zero Energy Performance Index (zEPI) ACP
posted by Priscillia Champagne on Aug 19, 2022, 1:41 pm

For the benefit of all :

...

Protected or preserved trees in calculator

Pilot-Credits SSpc158: Onsite Carbon Sequestration Through Plantings
posted by Courtney France on Aug 25, 2022, 11:09 am

For 'Protected', or preserved, trees on an existing site, are teams required to include them in BOTH the baseline and design case i-Tree calculations?  Exclude from both cases to avoid extra data...

Pilot-Credits SSpc130- Offsite Rainwater Management

Pilot-Credits SSpc130: Offsite Rainwater Management
posted by Aileen Craig on Sep 6, 2022, 4:45 pm

Hello, 

I'm curious if there are any more details as to why this pilot was closed, and if there are any plans to reintroduce this credit. 

Thank you for any insight. 

...

MRpc87 Available Facilities

Pilot-Credits MRpc87: Verified Construction & Demolition Recycling Rates
posted by Michelle Rosenberger on Sep 8, 2022, 2:48 pm

There are still very few facilities certified under RCI. Projects that have pursued this pilot have all been proximate to the necessary receiving facilities and would have likely used them anyway...

Pilot Credit

Pilot-Credits IPpc101: Integrative process
posted by AMIR ZULKHAIRI AHMAD BANGI on Sep 19, 2022, 1:22 am

As per the requirements of the pilot credit, we are noting our participation in this forum.

Privicity for Restrooms

Pilot-Credits EQpc117: Quality views in nonregularly occupied spaces
posted by Alicia Carrillo on Sep 30, 2022, 4:13 pm

Is it possible to consider obstruction such as louvers on Restrooms to mantain privacity while having quality views?

Trend of water meter and leak sensor in Japan projects

Pilot-Credits WEpc153: Water Leak Detection and Monitoring
posted by Yohei Ohashi on Oct 7, 2022, 2:52 am

I am seeking to achieve Pilot-Credits WEpc153 - Water Leak Detection and Monitoring for LEED ID+C. The Project in Japan generally is required to install a tenant level water meter and...

LEED O+M v4 Pilot Credit Participation

Pilot-Credits IPpc101: Integrative process
posted by Kelvin Chan on Oct 23, 2022, 11:53 pm

As per the requirements of the pilot credit, we are noting our participation in this forum.

Our project is located in Hong Kong.

I sugguested to sep up an IP team inclueds owner,...

Tree height and grade elevation data for future consideration?

Pilot-Credits SSpc158: Onsite Carbon Sequestration Through Plantings
posted by Yuki Suda on Oct 27, 2022, 1:19 am

Hi there, it appears that some of the carbon sequestration calculations out there considers tree heights and volume as part of the analysis, which was not asked when inputting data via i-Tree...

Cooling Towers to meet the loads of uninterrupted office systems

Pilot-Credits WEpc94: No Cooling Tower
posted by Adriana Hansen on Nov 4, 2022, 7:53 pm

Could projects with HVAC system base conception composed by direct expansion air cooled VRF system for all spaces, but including a condensing water plant to provide a condensate water point to...