Topic | Recent |
---|---|
Timing of Installation and CommissioningNC-v4 EAc5: Renewable energy productionposted by Michaella Wittmann on Jan 29, 2018, 11:22 am
The LEED Credit template for this credit indicates that the renewable installation has to be complete and commissioned prior to building occupancy. Are any exceptions made to this if the... Last reply: Deborah Lucking, Dec 9, 2019, 2:16 pm |
|
Recommened software for doing the Interior and Daylighting analyses.NC-v4 EQc7: Daylightposted by Jorng-ren Chern on Apr 10, 2018, 2:05 amin the Forum. Default Revit materials are a very good start, but when you want to define very specific glazing performance, please refer to the Forum post here: https://forums.autodesk.com/t5/lighting-solar-analysis-forum/critical-up... Log in or register to post comments Zahra Mirian LEEDuser Basic Member July 24, 2019- 4:53 pm Thanks for your response David, I have the latest version of Insight on my Revit 2019. I have cleaned up... Last reply: hj hjh, Jan 4, 2022, 7:29 am |
|
Quality Views in Non-Regularly Occupied SpacesPilot-Credits EQpc117: Quality views in nonregularly occupied spacesposted by Allison Wilson on Mar 15, 2019, 1:23 pm
In completing the pilot credit survey, I thought the item re: requiring this credit as a prerequisite was interesting. I don't know that this pilot credit would make sense as a prereq, but what... Last reply: SIG - Sustainability Main Account, Mar 25, 2021, 3:40 pm |
|
Any reason NOT to switch from v4 to v4.1 for the BPDO EPD credit?NC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Renee Shirey on Jul 12, 2019, 9:59 am
I looked at the changes, and I don't see a reason why the switch to v4.1 would not be of benefit. Am I missing anything, where it could potentially create a problem for a project? Last reply: Summer Minchew, Jul 23, 2020, 3:34 pm |
|
Stairwell Lighting zoneNC-v4 EAp2: Minimum Energy Performanceposted by Agnieszka Rylska on Jan 28, 2020, 8:21 am
According to ASHRAE 90.1, section 9.4.1.6 „g. Stairwell Lighting – Lighting in stairwells shall have one or more control devices to automaticcly reduce lighting power in any one controlled zone... Last reply: Marcus Sheffer, Oct 12, 2022, 11:15 am |
|
INpc155- Design for Indoor Air Quality and Infection ControlCS-v4 INc1: Innovationposted by Sustainability & Commissioning on Apr 25, 2023, 2:10 pm
Hi all, The Pilot Credit: Design for... Last reply: Deborah Lucking, Sep 26, 2024, 5:24 pm |
|
Single Ply Roof Membrane AdhesivesNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Dwayne Wacenske on Jun 2, 2010, 2:33 pmof you have seen this, but for those that are just referencing this forum thread related to roofing sealants, please see below information from the updated GBD&C 2009 addendum. All comments are dated... Last reply: Tristan Roberts, Mar 29, 2011, 12:29 am |
|
leed pilot credits- we need your help!Pilot-Credits PC9: Street Networkposted by brendan owens on Sep 9, 2010, 11:27 am
Hi LEEDusers - The idea behind pilot credits is to get feedback from project team members on the concepts we're testing so that USGBC can learn from your experience and make these credits... Last reply: Nicholas Swinehart, May 6, 2013, 10:44 am |
|
Pc5- PrelIminary Project PlanningPilot-Credits PC5: Preliminary Integrative Project Planning & Designposted by John Drigot on Oct 19, 2010, 4:35 pm
The LEED Pilot Credit Library Webinar I participated in today was long overdue and much appreciated. I applied for the Pilot Credit program back on 11/18/2009 and it took until 8/6/2010 before... Last reply: Teresa Cheung, Jan 11, 2011, 12:31 pm |
|
WFR questionCI-2009 IEQc8.1: Daylight and views - daylightposted by cecilia uri on Jan 26, 2012, 6:05 pm
I am working on a project wehre the offices are bout 140 sq ft, the window is 5'x5' and the VLT is .70... I am not achieving the credit 8.1 with the prescriptive method...Do I use the full 100%... Last reply: Jill Perry, PE, Feb 23, 2012, 3:15 pm |