Regd. Baseline Systems to be used for Buildings with both Cooling & Heating as per ASHRAE 90.1 2010NC-v4 EAp2: Minimum Energy Performanceposted by Anurag Ghosh on Jan 28, 2025, 1:48 am
Hello everyone, We are having a datacenter project which requires both cooling and heating as the outdoor temperatures vary from -20 degree C to 45 degree C. Now, in proposed... Last reply: Anurag Ghosh, Feb 26, 2025, 8:37 pm |
|
Financial support optionEBOM-v4 SSc1: Site development - protect or restore habitatposted by Tracy Smith on Sep 24, 2015, 3:09 pm
Hi, Just want to make sure I'm understanding this point correctly. If you go the financial support (offsite) path, is it true that literally all you have to do donate money to a... Last reply: Trista Brown, Dec 21, 2016, 6:11 pm |
|
Indoor Water Use ReductionCS-v4 WEp2: Indoor water use reductionposted by Karl Heitman on May 1, 2019, 11:58 amsignatures were required (as in this thread: https://leeduser.buildinggreen.com/forum/acceptable-forms-tenant-lease-agreement-leed-design-review-comments ) My understanding of the intent of this update from... Last reply: Dave Hubka, May 16, 2019, 9:09 am |
|
Open-office workstations thermal comfort controlCI-v4 EQc5: Thermal comfortposted by Zsuzsanna Gidro on Feb 5, 2019, 7:00 am
Hi! We have a project with open office areas including workstations with 12 people (2 desks facing each other counting as one workstation). The HVAC system is zoned in areas containing in... Last reply: Seema Pandya, Sep 29, 2020, 6:07 pm |
|
Office space only going for partial renovation.CI-v4 MPR2: Must use reasonable LEED boundariesposted by shashank gangil on May 14, 2021, 8:30 am
We have a client who lease out three floors in a office building in Hong Kong. They are currently renovating a part of these three floors. Total renovated area is approximately 30% of the total... Last reply: Edgar Arevalo, Mar 7, 2024, 12:14 am |
|
Energy Modeling Procedure for a Data CenterData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by Santiago Rodriguez on May 30, 2014, 3:21 pm
We are working on a project that is seeking the LEED NC 2009 Certification. The project is a data center so we are using the Minimum Energy Performance Data Center Calculator spreadsheet in order... Last reply: Marcus Sheffer, Jul 9, 2014, 12:18 pm |
|
WEpc94 No Cooling TowerPilot-Credits WEpc94: No Cooling Towerposted by Dave Hubka on Sep 20, 2021, 2:48 pmnot include a cooling tower or other system that uses the latent heat of the evaporative cooling of water, and is not connected to a District cooling system I will update the forum with any lessons after the... Last reply: Triple Green Building Group, Apr 28, 2022, 9:55 am |
|
Lowest flow shower on the marketNC-v4 WEp2: Indoor water use reductionposted by Sophie Kerr on Jul 15, 2019, 4:52 pm
What is the lowest flow shower you've come across? The lowest we have is 5.7 LPM (1.5 GPM). Last reply: Aron Roberts, Apr 24, 2025, 1:53 am |
|
Using "Social Equity Within the Project Team" Pilot Credit for a Design-Build projectPilot-Credits IPpc90: Social equity within the operations and maintenance staffposted by Megan Leslie on Sep 18, 2018, 1:20 pm
My company has a CSR report that complies with the requirements in Option 2. We have found that when our company makes up at least 20% (by cost) of the design contract we can easily achieve the... Last reply: Monica Wilson, Apr 18, 2025, 12:53 am |
|
Documentation for Inherently non-emitting materialsNC-v4 EQc2: Low-emitting materialsposted by Edgar Arevalo on Sep 29, 2023, 11:46 am
We have an insulation material that can comply either as inherently non-emitting or meets general emissions evaluation, and has been checked as inherently non-emitting by the contractor, but no... Last reply: Anna Okviana, May 17, 2025, 12:48 am |